Cette consultation se termine à 23 h 59 le :
19 janvier 2025
Résumé de la proposition
This proposal from Southshore Greenhouses Inc. and Mucci Farms Ltd. is to amend Environmental Compliance Approval numbers 3622-CJ44K5, 4487-CHR53P and 7750-CJ44YE for new stormwater management facilities and modifications to an existing works located at 1670 Seacliff Drive East, and 1717 Road 2 East, in the Town of Kingsville, Essex, Ontario.
Détails de l'emplacement
Adresse du site
1670 Seacliff Drive and 1717 Road 2 East
Town of Kingsville,
ON
Canada
Détails de l'emplacement du site
1670 Seacliff Drive and 1717 Road 2 East
Town of Kingsville, County of Essex, Ontario
Easting: 361830 Northing: 4655541
Carte de l'emplacement du site
L'épingle de localisation correspond à la zone approximative où a lieu l’activité environnementale.
Afficher cet emplacement sur une carte opens link in a new windowPromoteur(s)
Southshore Greenhouses Inc. and Mucci Farms Ltd.
1670 Seacliff Drive
Kingsville,
ON
N9Y 2M6
Canada
Détails de la proposition
This proposal from Southshore Greenhouses Inc. and Mucci Farms Ltd. is to amend Environmental Compliance Approval numbers 3622-CJ44K5, 4487-CHR53P and 7750-CJ44YE for new stormwater management facilities and modifications to an existing S.W.M. pond to accommodate the new greenhouse expansion and existing greenhouse ranges for collection, transmission, treatment and disposal of stormwater run-off from the lands located at 1670 Seacliff Drive East, and 1717 Road 2 East, in the Town of Kingsville, County of Essex, Ontario.
The stormwater management works consist of the following:
- Roof water drainage pipe systems, swales and on-site storm sewers, discharging roof top runoff and other surface runoff to the shared stormwater detention pond;
- One stormwater management detention/wet pond having an active storage volume of 22,439 cubic metres with a maximum active water depth of 3.718 metres for the 1:100 year storm event, discharging a maximum (total) release rate of 383 litres per second into the Ravine (172 litres per second) and the 2nd Concession Branch of the Esseltine Drain (211 litres per second);
- One stormwater dewatering pump station located near the southwest corner of the pond;
- One emergency overflow spillway directing flows to the west natural watercourse; and
- One Oil Grit Separator (OGS) model FD-4HC or approved equal, serving the warehouse parking areas
Documents justificatifs
Consulter les documents en personne
Certains documents justificatifs peuvent ne pas être accessibles en ligne. Si tel est le cas, vous pouvez demander à consulter les documents en personne.
Veuillez communiquer avec le bureau mentionné ci-dessous pour savoir si les documents sont accessibles.
135 St Clair Ave West
1st Floor
Toronto,
ON
M4V 1P5
Canada
Communiquer avec nous
Contact
Client Services and Permissions Branch
135 St Clair Ave West
1st Floor
Toronto,
ON
M4V 1P5
Canada
Commentaire
Dites-nous ce que vous pensez de notre proposition.
Vous avez des questions? Contactez la personne-ressource indiquée ci-dessous. Veuillez indiquer le numéro du REO de l’avis dans votre courriel ou votre lettre à la personne-ressource.Lire nos politiques relatives aux commentaires et à la protection de la vie privée.
Soumettre en ligne
Soumettre par la poste
Contact
Client Services and Permissions Branch
135 St Clair Ave West
1st Floor
Toronto, ON
M4V 1P5
Canada