Active Metal Finishing Company Limited and Bristol Plating Inc. - Environmental Compliance Approval (air)

Instrument type: Environmental Compliance Approval (air)

ERO number
019-9486
Ministry reference number
4856-DB2KWP
Notice type
Instrument
Act
Environmental Protection Act, R.S.O. 1990
Posted by
Ministry of the Environment, Conservation and Parks
Notice stage
Proposal
Proposal posted
Comment period
December 13, 2024 - January 27, 2025 (45 days) Open
Last updated

This consultation closes at 11:59 p.m. on:
January 27, 2025

Proposal summary

This proposal is for an Environmental Compliance Approval with Limited Operational Flexibility (Air and Noise) from Active Metal Finishing Company Limited and Bristol Plating Inc., an electroplating facility located in the City of Toronto, Ontario.

Location details

Site address

43 Advance Road
Toronto, ON
Canada

Site location map

The location pin reflects the approximate area where environmental activity is taking place.

View this location on a map opens link in a new window

Proponent(s)

Active Metal Finishing Company Limited and Bristol Plating Inc.
43 Advance Road
Toronto, ON
M8Z 2S6
Canada

Proposal details

This proposal is for an Environmental Compliance Approval with Limited Operational Flexibility (Air and Noise) which replaces all the current Environmental Compliance Approvals for Air at this facility and includes the addition of new or historically unapproved sources for all emissions from Active Metal Finishing Company Limited and Bristol Plating Inc., an electroplating facility located in the City of Toronto, Ontario.

The emission sources from the manufacturing and associated processes that discharge to the air include:

  • one (1) 50 HP gas fired boiler
  • one (1) gas fired oven
  • one (1) residential furnace
  • nitric acid and hydrochloric acid bulk storage tanks
  • electroplating lines.

This application is to reflect changes to operations and equipment including: adding Limited Operational Flexibility, replacing the gas fired boiler, adding one (1) residential furnace, adding a silver plating operation, and updating current sources.

Emissions to the air from this facility include:

  • nitrogen oxides
  • nitric acid
  • hydrogen chloride
  • chromium compounds (hexavalent forms)

The Environmental Compliance Approval with Limited Operational Flexibility (Air and Noise), when issued permits modifications to the facility subject to limits on operational flexibility that include a production limit for the facility to be specified on the Environmental Compliance Approval with Limited Operational Flexibility (Air and Noise). The limited operational flexibility conditions have an expiry date. The company will be required to make an application for amendment at that time to renew these conditions.

Supporting materials

View materials in person

Some supporting materials may not be available online. If this is the case, you can request to view the materials in person.

Get in touch with the office listed below to find out if materials are available.

Client Services and Permissions Branch
Address

135 St. Clair Avenue West
Floor 1
Toronto, ON
M4V 1P5
Canada

Office phone number

Comment

Let us know what you think of our proposal.

Have questions? Get in touch with the contact person below. Please include the ERO number for this notice in your email or letter to the contact.

Read our commenting and privacy policies.

Submit online

Submit by mail

Contact

Connect with us

Contact

Sign up for notifications

We will send you email notifications with any updates related to this consultation. You can change your notification preferences anytime by visiting settings in your profile page.

Follow this notice