Greenfield Global Inc. - Environmental Compliance Approval (air)

Instrument type: Environmental Compliance Approval (air)

ERO number
019-9503
Ministry reference number
3860-DB2MSH
Notice type
Instrument
Act
Environmental Protection Act, R.S.O. 1990
Posted by
Ministry of the Environment, Conservation and Parks
Notice stage
Proposal
Proposal posted
Comment period
December 19, 2024 - February 2, 2025 (45 days) Open
Last updated

This consultation closes at 11:59 p.m. on:
February 2, 2025

Proposal summary

This proposal is for an amendment to the Limited Operational Flexibility for an Environmental Compliance Approval (air & noise) No. 9225-BUKJNN for Greenfield Global Inc., a fuel grade and industrial ethanol production facility, located in the Municipality of Chatham-Kent, Ontario.

Location details

Site address

275 Bloomfield Road
Chatham-Kent, ON
Canada

Site location map

The location pin reflects the approximate area where environmental activity is taking place.

View this location on a map opens link in a new window

Proponent(s)

Greenfield Global Inc.
275 Bloomfield Road
Chatham, ON
N7M 5J5
Canada

Proposal details

This proposal is for an amendment to the Limited Operational Flexibility for an Environmental Compliance Approval (air & noise) No. 9225-BUKJNN for Greenfield Global Inc., a fuel grade and industrial ethanol production facility, located in the Municipality of Chatham-Kent, Ontario.

The emission sources from the manufacturing and associated processes that discharge to the air include grain receiving, handling, and milling; mash cooking; fermentation; distillation and dehydration; liquids and solids separation; evaporation; corn oil extraction; distillers grains recovery; product storage and transportation; as well as any other equipment and ancillary and support processes and activities at the site. The amendment includes lowering the operating temperature of the existing thermal oxidizer. Emissions to the air from this facility include:

  • benzene
  • ethanol
  • nitrogen oxides
  • particulate matter
  • odour, and
  • noise

The Environmental Compliance Approval with Limited Operational Flexibility (air & noise), when issued, permits modifications to the facility subject to limits on operational flexibility that include a production limit for the facility to be specified on the Environmental Compliance Approval with Limited Operational Flexibility (air & noise). The limited operational flexibility conditions have an expiry date. The company will be required to make an application for amendment at that time to renew these conditions.

Supporting materials

View materials in person

Some supporting materials may not be available online. If this is the case, you can request to view the materials in person.

Get in touch with the office listed below to find out if materials are available.

Client Services and Permissions Branch
Address

135 St. Clair Avenue West
Floor 1
Toronto, ON
M4V 1P5
Canada

Office phone number

Comment

Let us know what you think of our proposal.

Have questions? Get in touch with the contact person below. Please include the ERO number for this notice in your email or letter to the contact.

Read our commenting and privacy policies.

Submit online

Submit by mail

Contact

Connect with us

Contact

Sign up for notifications

We will send you email notifications with any updates related to this consultation. You can change your notification preferences anytime by visiting settings in your profile page.

Follow this notice