This consultation was open from:
January 27, 2025
to February 26, 2025
Proposal summary
This proposal is for a new Permit to Take Water for Anatolia Real Estate Corp. Water will be taken from four (4) wells for construction dewatering purposes, located in the Town of Milton, Ontario.
Location details
Site address
6728 Sixth Line
Milton,
ON
Canada
Site location map
The location pin reflects the approximate area where environmental activity is taking place.
View this location on a map opens link in a new windowProponent(s)
Anatolia Real Estate Corp.
8300 Huntington Road
Vaughan,
ON
L4H 4Z6
Canada
Proposal details
This proposal is for a new Permit to Take Water for Anatolia Real Estate Corp. Water will be taken from four (4) wells for construction dewatering purposes, located in the Town of Milton, Ontario. Details of the water taking are as follows:
Source name: Dewatering Zone 1
- purpose: Construction Dewatering
- maximum rate per minute (Litres): 108
- maximum number of hours of taking per day: 24
- maximum volume per day (Litres): 154,800
- maximum number of days of taking per year: 365
- earliest calendar date of taking (mm/dd): 01/01
- latest calendar date of taking (mm/dd): 12/31
- period of taking: 22 months
Source name: Dewatering Zone 2
- purpose: Construction Dewatering
- maximum rate per minute (Litres): 108
- maximum number of hours of taking per day: 24
- maximum volume per day (Litres): 155,400
- maximum number of days of taking per year: 365
- earliest calendar date of taking (mm/dd): 01/01
- latest calendar date of taking (mm/dd): 12/31
- period of taking: 34 months
Source name: Dewatering Zone 3
- purpose: Construction Dewatering
- maximum rate per minute (Litres): 931
- maximum number of hours of taking per day: 24
- maximum volume per day (Litres): 1,340,000
- maximum number of days of taking per year: 365
- earliest calendar date of taking (mm/dd): 01/01
- latest calendar date of taking (mm/dd): 12/31
- period of taking: 22 months
Source name: Dewatering Zone 4
- purpose: Construction Dewatering
- maximum rate per minute (Litres): 268
- maximum number of hours of taking per day: 24
- maximum volume per day (Litres): 385,400
- maximum number of days of taking per year: 365
- earliest calendar date of taking (mm/dd): 01/01
- latest calendar date of taking (mm/dd): 12/31
- period of taking: 34 months
There are 3 categories of a Permit to Take Water:
- Category 1: water takings are anticipated to have a lower risk of causing an unacceptable environmental impact/interference
- Category 2: water takings are anticipated to having a higher potential of causing unacceptable environmental impact or interference
- Category 3: water takings are anticipated to have the highest potential of causing unacceptable environmental impactor interference
The proposed water taking qualifies as a Category 3 permit.
Supporting materials
View materials in person
Some supporting materials may not be available online. If this is the case, you can request to view the materials in person.
Get in touch with the office listed below to find out if materials are available.
135 St Clair Ave West
1st Floor
Toronto,
ON
M4V 1P5
Canada
Connect with us
Contact
Client Services and Permissions Branch
135 St Clair Ave West
1st Floor
Toronto,
ON
M4V 1P5
Canada
Comment
Commenting is now closed.
The comment period was from January 27, 2025
to February 26, 2025