Ben Hokum and Son Limited - Permit to take water

Instrument type: Permit to take water

ERO number
025-0185
Ministry reference number
7718-DDS852
Notice type
Instrument
Act
Ontario Water Resources Act, R.S.O. 1990
Posted by
Ministry of the Environment, Conservation and Parks
Notice stage
Proposal
Proposal posted
Comment period
March 12, 2025 - April 11, 2025 (30 days) Open
Last updated

This consultation closes at 11:59 p.m. on:
April 11, 2025

Proposal summary

This proposal is to renew existing Permit to Take Water No. 0173-9UYRZH for Ben Hokum and Son Limited for the purpose of watering stockpiled lumber to prevent spoiling of the product.

Location details

Site address

Lot: 30 ,31 & 32, Concession: 6 & 7
Geographic Township: NORTH ALGONA
North Algona Wilberforce, ON
Canada

Site location map

The location pin reflects the approximate area where environmental activity is taking place.

View this location on a map opens link in a new window

Proponent(s)

Ben Hokum and Son Limited
206 Black Point Road
North Algona Wilberforce, ON
K0J 2A0
Canada

Proposal details

This proposal is to renew existing Permit to Take Water No. 173-9UYRZH for Ben Hokum and Son Limited for the purpose of watering stockpiled lumber to prevent spoiling of the product. Details of water takings are as follows:

Permit type – renewal

Source Name: Golden Lake

  • purpose: industrial
  • maximum rate per minute (litres):1,591.10
  • maximum number of hours of taking per day: 24
  • maximum volume per day (litres):2,291,184.00
  • maximum number of days of taking per year:184.00
  • earliest calendar date of taking (mm/dd): January 1
  • latest calendar date of taking (mm/dd): December 31
  • period of taking: 10 years

Source Name: Closed Loop Log Watering Pond

  • purpose: industrial
  • maximum rate per minute (litres):10,456.00
  • maximum number of hours of taking per day: 24
  • maximum volume per day (litres):15,001,800.00
  • maximum number of days of taking per year:184.00
  • earliest calendar date of taking (mm/dd): January 1
  • earliest calendar date of taking (mm/dd): December 31
  • period of taking: 10 years

There are 3 categories of a Permit to Take Water:

  • Category 1: water takings are anticipated to have a lower risk of causing an unacceptable environmental impact/interference
  • Category 2: water takings are anticipated to having a higher potential of causing unacceptable environmental impact or interference
  • Category 3: water takings are anticipated to have the highest potential of causing unacceptable environmental impactor interference

The proposed water taking qualifies as a Category 1 permit.

Supporting materials

View materials in person

Some supporting materials may not be available online. If this is the case, you can request to view the materials in person.

Get in touch with the office listed below to find out if materials are available.

Client Services and Permissions Branch
Address

135 St Clair Ave West
1st Floor
Toronto, ON
M4V 1P5
Canada

Office phone number

Comment

Let us know what you think of our proposal.

Have questions? Get in touch with the contact person below. Please include the ERO number for this notice in your email or letter to the contact.

Read our commenting and privacy policies.

Submit online

Submit by mail

Contact

Connect with us

Contact

Sign up for notifications

We will send you email notifications with any updates related to this consultation. You can change your notification preferences anytime by visiting settings in your profile page.

Follow this notice