VUTEQ CANADA INC - Environmental Compliance Approval (air)

Instrument type: Environmental Compliance Approval (air)

ERO number
025-0421
Ministry reference number
1000337387
Notice type
Instrument
Act
Environmental Protection Act, R.S.O. 1990
Posted by
Ministry of the Environment, Conservation and Parks
Notice stage
Proposal
Proposal posted
Comment period
May 21, 2025 - July 5, 2025 (45 days) Closed
Last updated

This consultation was open from:

May 21, 2025
to July 5, 2025

Proposal summary

This proposal is for an amendment to the Limited Operational Flexibility for an Environmental Compliance Approval (Air & Noise) No. A-500-9204118096 for VUTEQ CANADA INC, a manufacturing facility located at 920 Keyes Drive in Woodstock, Ontario.

Location details

Site address

920 KEYES DRIVE
Woodstock, Canada

Site location map

The location pin reflects the approximate area where environmental activity is taking place.

View this location on a map opens link in a new window

Proponent(s)

VUTEQ CANADA INC
P.O. Box 1588
Woodstock, ON
N4S0A7
Canada

Proposal details

This proposal is for an amendment to the Limited Operational Flexibility for an Environmental Compliance Approval (Air & Noise) No. A-500-9204118096 for VUTEQ CANADA INC, a manufacturing facility located at 920 Keyes Drive in Woodstock, Ontario. The emission sources from the manufacturing and associated processes that discharge to the air include injection molding, paint and adhesive application, drying, fabric and ornamental attachment, vacuum forming, small part installation and assembly, and packaging. The amendment is to modify the building by adding an additional 5000 square foot warehouse with new heating sources. Emissions to the air from this facility include:

  • metallic chromium
  • formic acid
  • nickel
  • propane
  • xylenes

The Environmental Compliance Approval with Limited Operational Flexibility (air), when issued, permits modifications to the facility subject to limits on operational flexibility that include a production limit for the facility to be specified on the Environmental Compliance Approval with Limited Operational Flexibility (air). The limited operational flexibility conditions have an expiry date. The company will be required to make an application for amendment at that time to renew these conditions.

Supporting materials

View materials in person

Some supporting materials may not be available online. If this is the case, you can request to view the materials in person.

Get in touch with the office listed below to find out if materials are available.

Client Services and Permissions Branch
Address

135 St Clair Ave West
1st Floor
Toronto, ON
M4V 1P5
Canada

Office phone number

Comment

Commenting is now closed.

The comment period was from May 21, 2025
to July 5, 2025

Connect with us

Contact

Sign up for notifications

We will send you email notifications with any updates related to this consultation. You can change your notification preferences anytime by visiting settings in your profile page.

Follow this notice