This consultation was open from:
April 28, 2025
to May 28, 2025
Proposal summary
This proposal is for a new Environmental Compliance Approval (sewage) to install stormwater management works facilities serving KingsOne Greenhouse, for the collection, transmission, treatment and disposal of stormwater run-off from the lands located at 838 Road 3 East, Kingsville, Ontario.
Location details
Site address
838 Road 3 East
Kingsville Town,
ON
Canada
Site location map
The location pin reflects the approximate area where environmental activity is taking place.
View this location on a map opens link in a new windowProponent(s)
1000265915 ONTARIO LIMITED
1746 Seacliff Drive
Kingsville,
ON
N9Y 2M6
Canada
Proposal details
This proposal is for a new Environmental Compliance Approval (sewage) to install stormwater management works facilities serving KingsOne Greenhouse, for the collection, transmission, treatment and disposal of stormwater run-off from the lands located at 838 Road 3 East, Kingsville, Ontario. The proposed stormwater system includes oil grit separator and wet pond for quantity and quality control; discharging to the 3rd Concession Road Drain East.
Supporting materials
View materials in person
Some supporting materials may not be available online. If this is the case, you can request to view the materials in person.
Get in touch with the office listed below to find out if materials are available.
135 St Clair Ave West
1st Floor
Toronto,
ON
M4V 1P5
Canada
Connect with us
Contact
Client Services and Permissions Branch
135 St Clair Ave West
1st Floor
Toronto,
ON
M4V 1P5
Canada
Comment
Commenting is now closed.
The comment period was from April 28, 2025
to May 28, 2025