Stubbe's Redi-Mix Inc. - Environmental Compliance Approval (air)

Instrument type: Environmental Compliance Approval (air)

ERO number
025-0454
Ministry reference number
2283-DEXPSQ
Notice type
Instrument
Act
Environmental Protection Act, R.S.O. 1990
Posted by
Ministry of the Environment, Conservation and Parks
Notice stage
Proposal
Proposal posted
Comment period
May 1, 2025 - June 15, 2025 (45 days) Open
Last updated

This consultation closes at 11:59 p.m. on:
June 15, 2025

Proposal summary

This proposal is for an Environmental Compliance Approval with Limited Operational Flexibility (air & noise) for all emissions from Stubbe's Redi-Mix Inc., a ready-mix concrete batching facility, located in the Township of West Lincoln, Ontario.

Location details

Site address

6209 Skyway Road
West Lincoln, ON
Canada

Site location map

The location pin reflects the approximate area where environmental activity is taking place.

View this location on a map opens link in a new window

Proponent(s)

Stubbe's Redi-Mix Inc.
44 Muir Line
Harley, ON
N0E 1E0
Canada

Proposal details

This proposal is for an Environmental Compliance Approval with Limited Operational Flexibility (air & noise) which replaces all the current Environmental Compliance Approvals for Air at this facility and includes the addition of new or historically unapproved sources for all emissions from Stubbe's Redi-Mix Inc., a ready-mix concrete batching facility, located in the Township of West Lincoln, Ontario.

The application includes all sources at the facility, including aggregate materials delivery, storage, and handling; cementitious materials delivery, storage, and handling; ready-mix concrete batching, truck loading, and shipping; combustion equipment; and dust control equipment. Emissions to the air from this facility include:

  • particulate matter
  • respirable crystalline silica (quartz)
  • Portland cement
  • slag
  • noise

The Environmental Compliance Approval with Limited Operational Flexibility (air & noise), when issued permits modifications to the facility subject to limits on operational flexibility that include a production limit for the facility to be specified on the Environmental Compliance Approval with Limited Operational Flexibility (air & noise). The Limited Operational Flexibility conditions have an expiry date. The company will be required to make an application for amendment at that time to renew these conditions.

Supporting materials

View materials in person

Some supporting materials may not be available online. If this is the case, you can request to view the materials in person.

Get in touch with the office listed below to find out if materials are available.

Client Services and Permissions Branch
Address

135 St. Clair Avenue West
Floor 1
Toronto, ON
M4V 1P5
Canada

Office phone number

Comment

Let us know what you think of our proposal.

Have questions? Get in touch with the contact person below. Please include the ERO number for this notice in your email or letter to the contact.

Read our commenting and privacy policies.

Submit online

Submit by mail

Contact

Connect with us

Contact

Sign up for notifications

We will send you email notifications with any updates related to this consultation. You can change your notification preferences anytime by visiting settings in your profile page.

Follow this notice