Magris Talc Canada Inc. - Environmental Compliance Approval (air)

Instrument type: Environmental Compliance Approval (air)

ERO number
025-0604
Ministry reference number
6064-DFRKYH
Notice type
Instrument
Act
Environmental Protection Act, R.S.O. 1990
Posted by
Ministry of the Environment, Conservation and Parks
Notice stage
Proposal
Proposal posted
Comment period
June 6, 2025 - July 21, 2025 (45 days) Open
Last updated

This consultation closes at 11:59 p.m. on:
July 21, 2025

Proposal summary

This proposal is for the renewal of the Limited Operational Flexibility for an Environmental Compliance Approval (air) No. 1136-9TMQXJ for Magris Talc Canada Inc., an open pit talc mining and concentrating facility located in the Unorganized Township of Reeves and Unorganized Township of Penhorwood, Ontario.

Location details

Site address

Penhorwood Mine Road off Highway 101 West
Reeves and Penhorwood, ON
Canada

Site location map

The location pin reflects the approximate area where environmental activity is taking place.

View this location on a map opens link in a new window

Proponent(s)

Magris Talc Canada Inc.
333 Bay Street, Suite 1101
Toronto, ON
M5H 2R2
Canada

Proposal details

This proposal is for the renewal of the Limited Operational Flexibility for an Environmental Compliance Approval (air) No. 1136-9TMQXJ for Magris Talc Canada Inc., an open pit talc mining and concentrating facility located in the Unorganized Township of Reeves and Unorganized Township of Penhorwood, Ontario.

The emission sources from the manufacturing and associated processes that discharge to the air include baghouses; drilling, blasting and material handling of talc ore and waste rock materials; material handling, crushing and screening operations; concentrating; and auxiliary support operations such as maintenance welding, heating and emergency power.

Emissions to the air from this facility include:

  • chromium (VI)
  • magnesium carbonate
  • methyl isobutyl carbinol
  • nickel
  • nitrogen oxides, and
  • particulate matter

The Environmental Compliance Approval with Limited Operational Flexibility (air), when issued, permits modifications to the facility subject to limits on operational flexibility that include a production limit for the facility to be specified on the Environmental Compliance Approval with Limited Operational Flexibility (air). The Limited Operational Flexibility conditions have an expiry date. The company will be required to make an application for amendment at that time to renew these conditions.

Supporting materials

View materials in person

Some supporting materials may not be available online. If this is the case, you can request to view the materials in person.

Get in touch with the office listed below to find out if materials are available.

Client Services and Permissions Branch
Address

135 St Clair Ave West
1st Floor
Toronto, ON
M4V 1P5
Canada

Office phone number

Comment

Let us know what you think of our proposal.

Have questions? Get in touch with the contact person below. Please include the ERO number for this notice in your email or letter to the contact.

Read our commenting and privacy policies.

Submit online

Submit by mail

Contact

Connect with us

Contact

Sign up for notifications

We will send you email notifications with any updates related to this consultation. You can change your notification preferences anytime by visiting settings in your profile page.

Follow this notice