Agnico Eagle Mines Limited - Environmental Compliance Approval (air)

Instrument type: Environmental Compliance Approval (air)

ERO number
025-0681
Ministry reference number
5643-DFRN9E
Notice type
Instrument
Act
Environmental Protection Act, R.S.O. 1990
Posted by
Ministry of the Environment, Conservation and Parks
Notice stage
Proposal
Proposal posted
Comment period
June 19, 2025 - August 3, 2025 (45 days) Closed
Last updated

This consultation was open from:

June 19, 2025
to August 3, 2025

Proposal summary

This proposal is for an amendment to the Limited Operational Flexibility for an Environmental Compliance Approval (air) No. 0865-BUY7L7 for Agnico Eagle Mines Limited, a gold mining and processing facility located in the Town of Cochrane, Ontario.

Location details

Site address

185 km from Cochrane via Highway 652
Cochrane, ON
Canada

Site location map

The location pin reflects the approximate area where environmental activity is taking place.

View this location on a map opens link in a new window

Proponent(s)

Agnico Eagle Mines Limited
145 King Street East, Suite 400
Toronto, ON
M5C 2Y7
Canada

Proposal details

This proposal is for an amendment to the Limited Operational Flexibility for an Environmental Compliance Approval (air) No. 0865-BUY7L7 for Agnico Eagle Mines Limited, a gold mining and processing facility located in the Town of Cochrane, Ontario.

The emission sources from the manufacturing and associated processes that discharge to the air include drilling, blasting, milling, transferring and hauling ore and mine rock, open pit gold mining operations, ore processing, gold refining, crushing operations, waste oil heaters, diesel emergency generators, diesel emergency fire pumps, scrubbers, and baghouse dust collectors.

The amendment includes expanding the consolidated open pit; re-adding a concrete batch plant; relocating a repair welding facility; and adding a north open pit, underground mining, mine rock stockpiles, airstrip, water treatment facilities, assay lab, and landfill. Emissions to the air from this facility include:

  • aluminum
  • carbon monoxide
  • potassium
  • nickel
  • nitrogen oxides
  • suspended particulate

The Environmental Compliance Approval with Limited Operational Flexibility (air), when issued, permits modifications to the facility subject to limits on operational flexibility that include a production limit for the facility to be specified on the Environmental Compliance Approval with Limited Operational Flexibility (air). The Limited Operational Flexibility conditions have an expiry date. The company will be required to make an application for amendment at that time to renew these conditions.

Supporting materials

View materials in person

Some supporting materials may not be available online. If this is the case, you can request to view the materials in person.

Get in touch with the office listed below to find out if materials are available.

Client Services and Permissions Branch
Address

135 St. Clair Avenue West
Floor 1
Toronto, ON
M4V 1P5
Canada

Office phone number

Comment

Commenting is now closed.

The comment period was from June 19, 2025
to August 3, 2025