Production Paint Stripping Ltd. - Environmental Compliance Approval (air)

Instrument type: Environmental Compliance Approval (air)

ERO number
025-0715
Ministry reference number
8849-DG2P3V
Notice type
Instrument
Act
Environmental Protection Act, R.S.O. 1990
Posted by
Ministry of the Environment, Conservation and Parks
Notice stage
Proposal
Proposal posted
Comment period
June 26, 2025 - August 10, 2025 (45 days) Closed
Last updated

This consultation was open from:

June 26, 2025
to August 10, 2025

Proposal summary

This proposal to amend the Environmental Compliance Approval (air and noise) No. 6062-8PAR8G for Production Paint Stripping Ltd., a metal paint stripping facility, located in the City of Toronto, Ontario.

Location details

Site address

11 McLachlan Drive
Etobicoke, ON
Canada

Site location map

The location pin reflects the approximate area where environmental activity is taking place.

View this location on a map opens link in a new window

Proponent(s)

Production Paint Stripping Ltd.
11 McLachlan Drive
Etobicoke, ON
M9W 1E3
Canada

Proposal details

This proposal to amend the Environmental Compliance Approval (air and noise) No. 6062-8PAR8G for Production Paint Stripping Ltd., a metal paint stripping facility, located in the City of Toronto, Ontario.

This application is for the approval of one additional natural gas fired burn-off oven, and the removal of the brake shoe processing line and paint stripping line. Contaminant emissions to the atmosphere include:

  • suspended particulate matter
  • nitrogen oxides
  • napthalene
  • propylene glycol
  • n-butyl acetates

Supporting materials

View materials in person

Some supporting materials may not be available online. If this is the case, you can request to view the materials in person.

Get in touch with the office listed below to find out if materials are available.

Client Services and Permissions Branch
Address

135 St. Clair Avenue West
Floor 1
Toronto, ON
M4V 1P5
Canada

Office phone number

Comment

Commenting is now closed.

The comment period was from June 26, 2025
to August 10, 2025

Connect with us

Contact

Sign up for notifications

We will send you email notifications with any updates related to this consultation. You can change your notification preferences anytime by visiting settings in your profile page.

Follow this notice