Harsco Canada Corporation - Environmental Compliance Approval (air)

Instrument type: Environmental Compliance Approval (air)

ERO number
025-0724
Ministry reference number
9183-DFQNGJ
Notice type
Instrument
Act
Environmental Protection Act, R.S.O. 1990
Posted by
Ministry of the Environment, Conservation and Parks
Notice stage
Proposal
Proposal posted
Comment period
June 27, 2025 - August 11, 2025 (45 days) Closed
Last updated

This consultation was open from:

June 27, 2025
to August 11, 2025

Proposal summary

This proposal is for an Environmental Compliance Approval with Limited Operational Flexibility (air) for all emissions from Harsco Canada Corporation, a slag processing plant, located in the County of Haldimand, Ontario.

Location details

Site address

2330 Haldimand 3
Haldimand, ON
Canada

Site location map

The location pin reflects the approximate area where environmental activity is taking place.

View this location on a map opens link in a new window

Proponent(s)

Harsco Canada Corporation
Post Office Box 997
Halifax, NS
B3J 2X2
Canada

Proposal details

This proposal is for an Environmental Compliance Approval with Limited Operational Flexibility (air) which replaces all the current Environmental Compliance Approvals (ECA) for air at this facility and includes the addition of new or historically unapproved sources for all emissions from Harsco Canada Corporation, a slag processing plant, located in the County of Haldimand, Ontario.

The application includes all sources at the facility, including torch cutting, slag processing, metallic recovery plants, and baghouses. The amendment includes consolidating ECA numbers 2441-4TRJ7Z and 8-2147-77-806; requesting Limited Operational Flexibility; and adding two track cutting torches and a hand torch. Emissions to the air from this facility include:

  • particulate matter
  • manganese
  • chromium
  • ferric oxide

The Environmental Compliance Approval with Limited Operational Flexibility (air), when issued permits modifications to the facility subject to limits on operational flexibility that include a production limit for the facility to be specified on the Environmental Compliance Approval with Limited Operational Flexibility (air). The Limited Operational Flexibility conditions have an expiry date. The company will be required to make an application for amendment at that time to renew these conditions.

Supporting materials

View materials in person

Some supporting materials may not be available online. If this is the case, you can request to view the materials in person.

Get in touch with the office listed below to find out if materials are available.

Client Services and Permissions Branch
Address

135 St. Clair Avenue West
Floor 1
Toronto, ON
M4V 1P5
Canada

Office phone number

Comment

Commenting is now closed.

The comment period was from June 27, 2025
to August 11, 2025