Cyclone Manufacturing Incorporated - Environmental Compliance Approval (air)

Instrument type: Environmental Compliance Approval (air)

ERO number
025-0793
Ministry reference number
5162-DGWHQX
Notice type
Instrument
Act
Environmental Protection Act, R.S.O. 1990
Posted by
Ministry of the Environment, Conservation and Parks
Notice stage
Proposal
Proposal posted
Comment period
July 11, 2025 - August 25, 2025 (45 days) Open
Last updated

This consultation closes at 11:59 p.m. on:
August 25, 2025

Proposal summary

This proposal is for an Environmental Compliance Approval with Limited Operational Flexibility (air & noise) from Cyclone Manufacturing Incorporated, an aerospace product and parts manufacturing facility, located in the City of Mississauga, Ontario.

Location details

Site address

7300 Rapistan Court
Mississauga, ON
Canada

Site location map

The location pin reflects the approximate area where environmental activity is taking place.

View this location on a map opens link in a new window

Proponent(s)

Cyclone Manufacturing Incorporated
7300 Rapistan Court
Mississauga, ON
L5N 5S1
Canada

Proposal details

This proposal is for an Environmental Compliance Approval with Limited Operational Flexibility (air & noise) which replaces all the current Environmental Compliance Approvals for Air at this facility and includes the addition of new or historically unapproved sources for all emissions from Cyclone Manufacturing Incorporated, an aerospace product and parts manufacturing facility, located in the City of Mississauga, Ontario.

The application includes all sources at the facility, including two deburring wet dust collection systems, water jet cutting table, an aluminum cutting saw equipped with a dust collector, comfort heating, and the general exhaust from the Compressor and Mezzanine areas. Emissions to the air from this facility include:

  • nitrogen oxides
  • aluminum
  • titanium, and
  • suspended particulate matter

The Environmental Compliance Approval with Limited Operational Flexibility (air & noise), when issued permits modifications to the facility subject to limits on operational flexibility that include a production limit for the facility to be specified on the Environmental Compliance Approval with Limited Operational Flexibility (air & noise). The Limited Operational Flexibility conditions have an expiry date. The company will be required to make an application for amendment at that time to renew these conditions.

Supporting materials

View materials in person

Some supporting materials may not be available online. If this is the case, you can request to view the materials in person.

Get in touch with the office listed below to find out if materials are available.

Client Services and Permissions Branch
Address

135 St. Clair Avenue West
Floor 1
Toronto, ON
M4V 1P5
Canada

Office phone number

Comment

Let us know what you think of our proposal.

Have questions? Get in touch with the contact person below. Please include the ERO number for this notice in your email or letter to the contact.

Read our commenting and privacy policies.

Submit online

Submit by mail

Contact

Connect with us

Contact

Sign up for notifications

We will send you email notifications with any updates related to this consultation. You can change your notification preferences anytime by visiting settings in your profile page.

Follow this notice