Dana Canada Corporation - Environmental Compliance Approval (air)

Instrument type: Environmental Compliance Approval (air)

ERO number
025-1239
Ministry reference number
1000370343
Notice type
Instrument
Act
Environmental Protection Act, R.S.O. 1990
Posted by
Ministry of the Environment, Conservation and Parks
Notice stage
Proposal
Proposal posted
Comment period
November 5, 2025 - December 20, 2025 (45 days) Open
Last updated

This consultation closes at 11:59 p.m. on:
December 20, 2025

Proposal summary

This proposal is for an Environmental Compliance Approval with Limited Operational Flexibility (air & noise) from Dana Canada Corporation, a manufacturer of heat exchanger products for the automotive industry and an operator of a ground water remediation system, located in the City of Cambridge, Ontario.

Location details

Site address

401 Franklin Boulevard
Cambridge, ON
Canada

Site location map

The location pin reflects the approximate area where environmental activity is taking place.

View this location on a map opens link in a new window

Proponent(s)

Dana Canada Corporation
656 Kerr Street
Oakville, ON
L6K 3E4
Canada

Proposal details

This proposal is for an Environmental Compliance Approval with Limited Operational Flexibility (air & noise) which replaces all the current Environmental Compliance Approvals for Air at this facility and includes the addition of new or historically unapproved sources for all emissions from Dana Canada Corporation, a manufacturer of heat exchanger products for the automotive industry and an operator of a ground water remediation system, located in the City of Cambridge, Ontario.

The application includes all sources at the facility, including stamping and forming presses, parts washing and lubrication operations, brazing and flux-brazing operations, welding, quality control and research/development operations, assembly operations, and groundwater treatment system operations. Emissions to the air from this facility include:

  • nitrogen oxides
  • mineral spirits, and
  • nickel

The Environmental Compliance Approval with Limited Operational Flexibility (air & noise), when issued permits modifications to the facility subject to limits on operational flexibility that include a production limit for the facility to be specified on the Environmental Compliance Approval with Limited Operational Flexibility (air & noise). The Limited Operational Flexibility conditions have an expiry date. The company will be required to make an application for amendment at that time to renew these conditions.

Supporting materials

View materials in person

Some supporting materials may not be available online. If this is the case, you can request to view the materials in person.

Get in touch with the office listed below to find out if materials are available.

Client Services and Permissions Branch
Address

135 St. Clair Avenue West
Floor 1
Toronto, ON
M4V 1P5
Canada

Office phone number

Comment

Let us know what you think of our proposal.

Have questions? Get in touch with the contact person below. Please include the ERO number for this notice in your email or letter to the contact.

Read our commenting and privacy policies.

Submit online

Submit by mail

Contact

Connect with us

Contact

Sign up for notifications

We will send you email notifications with any updates related to this consultation. You can change your notification preferences anytime by visiting settings in your profile page.

Follow this notice