This consultation closes at 11:59 p.m. on:
January 2, 2026
Proposal summary
Clean Harbors is proposing to construct a contingency process water pond located on the north west side of the facility, adjacent to Cell 18. The proposed pond would be constructed outside of the landfill footprint, on virgin land.
Location details
Site address
4090 Telfer Road, R.R. #1
St. Clair,
ON
Canada
Site location map
The location pin reflects the approximate area where environmental activity is taking place.
View this location on a map opens link in a new windowProponent(s)
Clean Harbors Canada, Inc.
4090 Telfer Road, R.R. #1
St. Clair,
ON
N0N 1G0
Canada
Proposal details
Clean Harbors operates an integrated hazardous waste management facility located on Lot 9 and part of Lot 8 in the Township of St. Clair. A key operational factor at the site is the appropriate management and collection of surface water at the site. One approach to managing surface water is to collect and manage water that falls onto processing areas into process water storage ponds. Currently, Clean Harbors has five existing process ponds around the site to manage process water. Due to operational needs, an additional pond is required for future weather events.
Clean Harbors is proposing to construct a contingency process water pond located on the north west side of the facility, adjacent to Cell 18. The proposed pond would be constructed outside of the landfill footprint, on virgin land.
The pond will be constructed of compacted clay. The pond walls will have a top elevation of approximately 207.3 metres above sea level and the pond base will be at 202.0 metres above sea level. The company is proposing to construct the pond in two phases. The pond constructed in phase one would have a total storage capacity of 56,000 cubic metres. The addition of the phase one pond will double the current storage capacity for process water at the facility. In phase two the pond would be expanded to have a total storage capacity of 87,000 cubic metres.
The new Process Pond will be an as-built pond as per the other process water ponds. The general layout of the pond and typical cross section of the ponds is provided in the supplemental information. The company would construct the pond as per phase one, and then construct phase two if determined to be operationally required.
Supporting materials
View materials in person
Some supporting materials may not be available online. If this is the case, you can request to view the materials in person.
Get in touch with the office listed below to find out if materials are available.
135 St Clair Ave West
1st Floor
Toronto,
ON
M4V 1P5
Canada
Connect with us
Contact
Client Services and Permissions Branch
135 St Clair Ave West
1st Floor
Toronto,
ON
M4V 1P5
Canada
Comment
Let us know what you think of our proposal.
Have questions? Get in touch with the contact person below. Please include the ERO number for this notice in your email or letter to the contact.Read our commenting and privacy policies.
Submit online
Submit by mail
Contact
Client Services and Permissions Branch
135 St Clair Ave West
1st Floor
Toronto, ON
M4V 1P5
Canada