Proposal summary
This application is for a new Environmental Compliance Approval (ECA) for a proposed on site septic system designed to service 200 greenhouse workers living in bunkhouses on site, plus an allowance for 25 local staff.
Location details
Site address
1975 Graham Side Road
Kingsville,
ON
Canada
Site location map
The location pin reflects the approximate area where environmental activity is taking place.
View this location on a map opens link in a new windowProponent(s)
1808278 Ontario Inc.
1975 Graham Side Road
Kingsville,
ON
N9Y 2E4
Canada
Proposal details
This application is for a new ECA for a proposed on site septic system designed to service 200 greenhouse workers living in bunkhouses on site, plus an allowance for 25 local staff.
The septic system is designed for a peak flow of 52,000 litres per day and includes pre-treatment tanks and tertiary treatment units with ultraviolet disinfection to be discharged to Lane Drain on the east side of Graham Side Road. Lane drain is a municipal drain which conveys stormwater southerly and ultimately discharges to Lake Erie.
Supporting materials
View materials in person
Some supporting materials may not be available online. If this is the case, you can request to view the materials in person.
Get in touch with the office listed below to find out if materials are available.
135 St Clair Ave West
1st Floor
Toronto,
ON
M4V 1P5
Canada
Connect with us
Contact
Client Services and Permissions Branch
135 St Clair Ave West
1st Floor
Toronto,
ON
M4V 1P5
Canada
Comment
Commenting is now closed.
The comment period was from February 17, 2026
to April 3, 2026