This consultation was open from:
April 14, 2026
to May 29, 2026
Proposal summary
This proposal requests a new Environmental Compliance Approval (sewage) for the existing stormwater management facility constructed to support the industrial building expansion completed in 2022. The works provide for the collection, conveyance, treatment, and discharge of stormwater runoff from the site at 5015 8th Concession Road in Maidstone.
Location details
Site address
5015 8th Concession Road
Maidstone,
ON
Canada
Site location map
The location pin reflects the approximate area where environmental activity is taking place.
View this location on a map opens link in a new windowProponent(s)
RJ Cyr Co. Inc.
5015 8th Concession Road
Tecumseh,
ON
N0R 1K0
Canada
Proposal details
This proposal requests a new Environmental Compliance Approval (sewage) for the existing stormwater management facility constructed to support the industrial building expansion completed in 2022.
The works provide for the collection, conveyance, treatment, and discharge of stormwater runoff from the site at 5015 8th Concession Road in Maidstone, Town of Tecumseh, Ontario.
The system includes a dry pond, asphalt parking areas, landscaped surfaces, an oil-and-grit separator, and enhanced grassed swales designed for both quantity and quality control. Treated flows discharge to the Demonte Drain within the Little River watershed.
Supporting materials
View materials in person
Some supporting materials may not be available online. If this is the case, you can request to view the materials in person.
Get in touch with the office listed below to find out if materials are available.
135 St Clair Ave West
1st Floor
Toronto,
ON
M4V 1P5
Canada
Connect with us
Contact
Client Services and Permissions Branch
135 St Clair Ave West
1st Floor
Toronto,
ON
M4V 1P5
Canada
Comment
Commenting is now closed.
The comment period was from April 14, 2026
to May 29, 2026