This consultation was open from:
May 8, 2026
to June 7, 2026
Proposal summary
This proposal is for a new Permit to Take Water for R. W. TOMLINSON LIMITED. Water will be taken from one pond for aggregate washing, aggregate extraction, and construction, located in Codrington, Ontario.
Location details
Site address
395 Loomis Road
Codrington,
ON
Canada
Site location map
The location pin reflects the approximate area where environmental activity is taking place.
View this location on a map opens link in a new windowProponent(s)
R. W. TOMLINSON LIMITED
100 CITIGATE DRIVE
Nepean ,
ON
K2J 6K7
Canada
Proposal details
This proposal is for a new Permit to Take Water for R. W. TOMLINSON LIMITED. Water will be taken from one pond for aggregate washing, aggregate extraction, and construction, located in Codrington, Ontario. Details of the water taking are as follows:
Permit type –New
Source Name: Source Pond
- Purpose: aggregate washing
- Maximum rate per minute (litres): 7,500
- Maximum number of hours of taking per day: 24
- Maximum volume per day (litres): 10,800,000
- Maximum number of days of taking per year: 306
- Earliest calendar date of taking (mm/dd):01/01
- Latest calendar date of taking (mm/dd):12/31
- Period of taking:10 years
Source Name:Source Pond
- Purpose: aggregate extraction
- Maximum rate per minute (litres): 7,500
- Maximum number of hours of taking per day: 16
- Maximum volume per day (litres): 500,000
- Maximum number of days of taking per year: 306
- Earliest calendar date of taking (mm/dd): 01/01
- Latest calendar date of taking (mm/dd):12/31
- Period of taking: 10 years
Source Name:Source Pond
- Purpose: construction
- Maximum rate per minute (litres): 7,500
- Maximum number of hours of taking per day: 16
- Maximum volume per day (litres): 500,000
- Maximum number of days of taking per year: 306
- Earliest calendar date of taking (mm/dd):01/01
- Latest calendar date of taking (mm/dd):12/31
- Period of taking: 10 years
There are 3 categories of a Permit to Take Water:
- Category 1: water takings are anticipated to have a lower risk of causing an unacceptable environmental impact/interference
- Category 2: water takings are anticipated to having a higher potential of causing unacceptable environmental impact or interference
- Category 3: water takings are anticipated to have the highest potential of causing unacceptable environmental impactor interference
The proposed water taking qualifies as a Category 3 permit.
Supporting materials
View materials in person
Some supporting materials may not be available online. If this is the case, you can request to view the materials in person.
Get in touch with the office listed below to find out if materials are available.
135 St Clair Ave West
1st Floor
Toronto,
ON
M4V 1P5
Canada
Connect with us
Contact
Client Services and Permissions Branch
135 St Clair Ave West
1st Floor
Toronto,
ON
M4V 1P5
Canada
Comment
Commenting is now closed.
The comment period was from May 8, 2026
to June 7, 2026