This consultation closes at 11:59 p.m. on:
December 31, 2026
Proposal summary
This proposal is for an amendment to an existing Environmental Compliance Approval (ECA) No. CA 1953-D5VJ86 for the construction of dwelling and installation of Class 4 Sewage System at 795518 Blue Mountains-Clearview Townline, The Blue Mountains.
Location details
Site address
795518 Blue Mountains-Clearview Town
The Blue Mountains ,
ON
L9Y 0R7
Canada
Site location map
The location pin reflects the approximate area where environmental activity is taking place.
View this location on a map opens link in a new windowProponent(s)
The Osler Bluff Ski Club Limited
795534 Blue Mountains Clearview Tline
The Blue Mountains,
ON
L9Y 0R7
Canada
Proposal details
This proposal is for an amendment to an existing Environmental Compliance Approval (ECA) No. CA 1953-D5VJ86 for the sewage works at The Osler Bluff Ski Club, specifically for the private system to service the new dwelling that is proposed at 795518 Blue Mountains-Clearview Townline.
We believe it will be known as "LOT 63" on Schedule B of the approved ECA. As the lot is one of several within a single property and leased to the club, the overall sewage flow rates generated by the site exceed 10,000 litres per and the sewage works are therefore subject to the Ministry of the Environment, Conservation and Parks (MECP) review and approval.
This is an application to amend an existing ECA for residential sewage works for private systems installed throughout the property. The project involves the construction of a new dwelling and installation of a Class 4 Sewage System at 795518 Blue Mountains-Clearview Townline. The existing dwelling and septic are to be removed and replaced.
The project involves the construction of a new single-family residence that will be serviced by a private on-site Class 4 Sewage System. The sewage flow for the proposed residence at Lot 63 is calculated to be 2,600 litres per day. The private on-site Class 4 Sewage System proposed for the subject lot comprises a septic tank having a minimum working capacity of 5,200 litres, a 1,800-litres external pump chamber, and 30 (not 34) Eljen GSF A42 Modules set within a total leaching bed area covering 342 square metres. As the subject lot is part of a larger property that has a cumulative peak flow in excess of 10,000 litres per day. As such, the Town of the Blue Mountains requires an ECA be obtained from the MECP.
Supporting materials
View materials in person
Some supporting materials may not be available online. If this is the case, you can request to view the materials in person.
Get in touch with the office listed below to find out if materials are available.
40 St. Clair Avenue West
Floor 2
Toronto,
ON
M4V 1M2
Canada
Connect with us
Contact
Client Services and Permissions Branch
40 St. Clair Avenue West
Floor 2
Toronto,
ON
M4V 1M2
Canada
Comment
Let us know what you think of our proposal.
Have questions? Get in touch with the contact person below. Please include the ERO number for this notice in your email or letter to the contact.Read our commenting and privacy policies.
Submit online
Submit by mail
Contact
Client Services and Permissions Branch
40 St. Clair Avenue West
Floor 2
Toronto, ON
M4V 1M2
Canada