Greenwater Limited - Environmental Compliance Approval (air)

Instrument type: Environmental Compliance Approval (air)

ERO number
026-1182
Ministry reference number
7096-DZ4PH5
Notice type
Instrument
Act
Environmental Protection Act, R.S.O. 1990
Posted by
Ministry of the Environment, Conservation and Parks
Notice stage
Proposal
Proposal posted
Comment period
November 16, 2026 - December 31, 2026 (45 days) Open
Last updated

This consultation closes at 11:59 p.m. on:
December 31, 2026

Proposal summary

This proposal is for an Environmental Compliance Approval with Limited Operational Flexibility (air and noise) which replaces all the current Environmental Compliance Approvals for Air at this facility and includes the addition of new or historically unapproved sources for all emissions from Greenwater Limited for a facility located in Thunder Bay.

Location details

Site address

2001 Neebing Avenue
Thunder Bay, Canada

Site location map

The location pin reflects the approximate area where environmental activity is taking place.

View this location on a map opens link in a new window

Proponent(s)

Greenwater Limited
66 Wellington Street West
Suite 5300
Toronto, ON
M5K 1E6
Canada

Proposal details

This proposal is for an Environmental Compliance Approval with Limited Operational Flexibility (air and noise) which replaces all the current Environmental Compliance Approvals for Air at this facility and includes the addition of new or historically unapproved sources for all emissions from Greenwater Limited for the pilot facility producing diesel, located in the City of Thunder Bay, Ontario.

The application includes all sources at the facility, including constructing and operating a 10-bone dry metric tonnes per day biomass-to-diesel pre-commercialization demonstration plant.

Emissions to the air from this facility include:

  • nitrogen oxides
  • particulate matter
  • biphenyl, and 
  • naphthalene

The Environmental Compliance Approval with Limited Operational Flexibility (air), when issued permits modifications to the facility subject to limits on operational flexibility that include a production limit for the facility to be specified on the Environmental Compliance Approval with Limited Operational Flexibility (air and noise). The Limited Operational Flexibility conditions have an expiry date. The company will be required to make an application for amendment at that time to renew these conditions.

Supporting materials

View materials in person

Some supporting materials may not be available online. If this is the case, you can request to view the materials in person.

Get in touch with the office listed below to find out if materials are available.

Client Services and Permissions Branch
Address

40 St. Clair Avenue West
Floor 2
Toronto, ON
M4V 1M2
Canada

Office phone number

Comment

Let us know what you think of our proposal.

Have questions? Get in touch with the contact person below. Please include the ERO number for this notice in your email or letter to the contact.

Read our commenting and privacy policies.

Submit online

Submit by mail

Contact

Connect with us

Contact

Share

Email

Facebook

X

Sign up for notifications

We will send you email notifications with any updates related to this consultation. You can change your notification preferences anytime by visiting settings in your profile page.

Follow this notice