The ministry has issued a new Environmental Compliance Approval (sewage) to Toronto Hydro-Electric System Limited for the installation of an oil containment system as part of transformer replacement work serving electrical utility distribution stations, located at 62 Elmhurst Drive, in the City of Toronto, Ontario.
February 17, 2021 - April 3, 2021 (45 days) Closed
Last updated
We issued an amended Environmental Compliance Approval (air & noise) to Cascade (Canada) Ltd., a manufacturer of lift truck forks, attachments, and lift handling products, located in the Township of Puslinch, Ontario.
Instrument type:
Approval for variance from the Liquid Fuels Handling Code
ERO number
019-1748
Notice type
Instrument
Notice stage
Proposal
Proposal posted
Comment period
May 4, 2020 - June 3, 2020 (30 days) Closed
Last updated
The applicant wants to replace several tank and dispenser sump entry boots (fittings that connect piping to a containment system) with retrofit boots made by Icon Products.
Instrument type:
Approval for variance from the Liquid Fuels Handling Code
ERO number
019-1903
Notice type
Instrument
Notice stage
Proposal
Proposal posted
Comment period
June 8, 2020 - July 8, 2020 (30 days) Closed
Last updated
The applicant wants to replace several tank and dispenser sump entry boots (fittings that connect piping to a containment system) with retrofit boots made by Icon Products.
Instrument type:
Approval for variance from the Liquid Fuels Handling Code
ERO number
019-1684
Notice type
Instrument
Notice stage
Proposal
Proposal posted
Comment period
April 20, 2020 - May 20, 2020 (30 days) Closed
Last updated
The applicant wants to replace several tank and dispenser sump entry boots (fittings that connect piping to a containment system) with retrofit boots made by Icon Products.
Instrument type:
Permit for activities to achieve an overall benefit to a species
ERO number
019-0368
Notice type
Instrument
Notice stage
Decision
Decision posted
Proposal posted
Comment period
July 30, 2019 - August 29, 2019 (30 days) Closed
Last updated
We have issued a benefit permit to the Regional Municipality of York for construction activities that will impact Redside Dace. The permit includes actions to minimize adverse effects and benefit the species, as well as monitoring and reporting requirements.
An approval was issued to amend Environmental Compliance Approval (air & noise) No. 0004-AHJJKY for the renewal of the Limited Operational Flexibility conditions, for Vale Canada Limited, Coleman-McCreedy East mine, located in Sudbury, Ontario.