January 10, 2025 - February 24, 2025 (45 days) Closed
Last updated
A new Environmental Compliance Approval is granted to Parkhill Meats Limited for the collection, transmission, treatment and disposal of process wastewater and storm drainage for the Parkhill Meats Facility located at the Municipality of North Middlesex.
August 4, 2022 - September 3, 2022 (30 days) Closed
Last updated
A new Environmental Compliance Approval was granted to Riverside RV Resort & Campground Inc. for a temporary septic holding tank to service a trailer park, located at 84 Robinson Rd., in the Town of Tweed, Ontario. The site is currently service by a subsurface disposal system.
December 22, 2022 - January 21, 2023 (30 days) Closed
Last updated
This decision is for the renewal of Permit to Take Water No. 5124-C25QT3, for Kirkland Lake Gold Ltd., for industrial purposes at the Detour Lake Mine, located approximately 185 kilometres north-east of Cochrane, Ontario.
Instrument type:
Approval to register for a technical standard for air pollution (industry standard)
ERO number
019-6359
Notice type
Instrument
Notice stage
Proposal
Proposal posted
Comment period
March 23, 2023 - May 7, 2023 (45 days) Closed
Last updated
This proposal is for C. Valley Asphalt Inc., located in Woodbridge, Ontario, to be registered under the Technical Standards Registry – Air Pollution. This facility will adhere to all technical and operational requirements in the Asphalt Mix – Industry Standard under the Local Air Quality Regulation (O. Reg. 419/05).
Instrument type:
Approval to register for a technical standard for air pollution (industry standard)
ERO number
025-0684
Notice type
Instrument
Notice stage
Proposal
Proposal posted
Comment period
August 5, 2025 - September 19, 2025 (45 days) Closed
Last updated
This proposal is for Kubota Materials Canada Corporation, located in Orillia, Ontario, to be registered under the Technical Standards Registry – Air Pollution (technical standards registry). This facility will adhere to all technical and operational requirements in the Foundries – Industry Standard under the Local Air Quality Regulation.
The Minister has issued an overall benefit permit under the Endangered Species Act, 2007 to the Town of Halton Hills create a trail system within regulated habitat of Reside Dace, which is a species at risk. The permit includes actions to minimize adverse effects, actions to benefit the species, as well as monitoring and reporting requirements.
Instrument type:
Approval for a consent (subject to conditions) in an area where there is no official plan in place
ERO number
019-2971
Notice type
Instrument
Notice stage
Decision
Decision posted
Proposal posted
Comment period
January 14, 2021 - February 13, 2021 (30 days) Closed
Last updated
Pursuant to Section 53 of the Planning Act, provisional consent was granted in respect of Application 58-C-189386 for the creation of one (1) new resource-based recreational lot for land described as PIN 62279-9513 and PIN 62279-9515, Whitefish Lake, Unincorporated Township of Hardwick & Jean, District of Thunder Bay.
August 6, 2021 - September 20, 2021 (45 days) Closed
Last updated
An Environmental Compliance Approval was issued to G. Tackaberry & Sons Construction Company Limited for the establishment of sewage works for the treatment and disposal of water, accumulating within the confines of the 15.1 hectares extraction area of the existing Richmond Quarry, located in the Township of Drummond-North Elmsley.
July 25, 2018 - September 8, 2018 (45 days) Closed
Last updated
The July 2018 proposal for a new Environmental Compliance Approval for industrial stormwater management works serving Nieuwland Feed & Supply Limited, located at Wellington Street North, Township of Mapleton, County of Wellington was withdrawn and closed by the ministry.
The Director of Exploration has made a decision on the exploration permit application PR-22-000188 to Sabina Gold & Silver Corp. for early exploration activities.
The decision is to: issue the mineral exploration permit
Instrument type:
Approval for a consent (subject to conditions) in an area where there is no official plan in place
ERO number
019-9112
Notice type
Instrument
Notice stage
Decision
Decision posted
Proposal posted
Comment period
August 27, 2024 - September 26, 2024 (30 days) Closed
Last updated
Pursuant to section 53 of the Planning Act, provisional consent to transfer a small portion of land between two residential lots to resolve an encroachment issue was granted on October 03, 2024, subject to conditions.
Instrument type:
Approval for a consent (subject to conditions) in an area where there is no official plan in place
ERO number
019-5447
Notice type
Instrument
Notice stage
Decision
Decision posted
Proposal posted
Comment period
July 19, 2022 - August 18, 2022 (30 days) Closed
Last updated
Application 58-C-227771 was approved subject to conditions September 16, 2022. The appeal deadline for this file under the Planning Act is October 6, 2022.
Instrument type:
Permit for activities to achieve an overall benefit to a species
ERO number
019-4540
Notice type
Instrument
Notice stage
Decision
Decision posted
Proposal posted
Comment period
January 10, 2022 - February 9, 2022 (30 days) Closed
Last updated
The Minister has issued an overall benefit permit under the Endangered Species Act, 2007 to 11034936 Canada Inc. for construction activities that will impact Blanding’s Turtle, which is a species at risk. The permit includes actions to benefit the species and minimize adverse effects, and requires monitoring and reporting.
An Environmental Compliance Approval (waste site) 19-OTT-50848 for Perth & District Septic was issued on August 20, 2019 for a hauled sewage site in North Elmsley Township, Ontario.
Approval is granted for existing storm sewer serving Speare Seeds Limited site, located at 99 John Street North, in the Town of Minto. The storm sewer outlet via an existing outlet pipe into the existing municipal ditch.
We approved the amendment to Environmental Compliance Approval (Air & Noise) No. 0557-BDVQN3 for Regency Plastics Company Limited, located in North York, Ontario.
The proposal is for a new Environmental Compliance Approval for stormwater management works serving BP2B INC., located at 260 Queen Street North, in the Town of New Tecumseth, Ontario.
The Director of Exploration has made a decision on the Victor Mine Closure Plan Amendment # 4 to De Beers Canada Incorporated for the Victor Mine Site located approximately 90 kilometres west of Attawapiskat, District of Kenora, North East Region.
The decision is to file Closure Plan Amendment # 4.