Parkhill Meats Limited - Environmental Compliance Approval (sewage)

Instrument type: Environmental Compliance Approval (sewage)

ERO number
025-0041
Ministry reference number
4223-DBFJH5
Notice type
Instrument
Act
Environmental Protection Act, R.S.O. 1990
Posted by
Ministry of the Environment, Conservation and Parks
Notice stage
Proposal
Proposal posted
Comment period
January 10, 2025 - February 24, 2025 (45 days) Open
Last updated

This consultation closes at 11:59 p.m. on:
February 24, 2025

Proposal summary

This proposal is for a new Environmental Compliance Approval (sewage) to establish a stormwater management works facility and a wash water/non‐agricultural source materials tank serving an existing meat processing plant, in support of a proposed expansion development of a site located at 3900 Elginfield Road, in North Middlesex/Parkhill, Ontario.

Location details

Site address

3900 Elginfield Road
Municipality of North Middlesex, ON
Canada

Site location details

Parkhill Meats

Site location map

The location pin reflects the approximate area where environmental activity is taking place.

View this location on a map opens link in a new window

Proponent(s)

Parkhill Meats Limited
3900 Elginfield Road
Parkhill, ON
N0M 2K0
Canada

Proposal details

This proposal is for a new Environmental Compliance Approval (sewage) to establish a stormwater management works facility serving an existing meat processing plant, in support of a proposed expansion development of a site located at 3900 Elginfield Road, on the north side of Elginfield Road, east of McLean Road and west of Cassidy Road, in North Middlesex/Parkhill, Ontario.

The sewage works design include the supply and installation of a new stormwater management facility (dry pond) for water quantity and quantity control, which will discharge from the site to the Jansen-McLean Drain, within the Mud Creek/Lake Huron Watershed.

The proposal further includes the supply and installation of a wash water/non‐agricultural source materials tank. The proposed meat packing/processing facility expansion involves a complete washdown of the processing area and the washdown wastewater (by pressure washing) will be sent to the 367,000 litres wash water/non‐agricultural source holding tank located on the north side of the facility through floor drains that are located throughout the processing facility.

The wastewater will first flow through an oil/grease separator tank after which it will flow into the wastewater tank. The wastewater will be then pumped into a tanker truck which will transport the wastewater to an approved site for processing.

Supporting materials

View materials in person

Some supporting materials may not be available online. If this is the case, you can request to view the materials in person.

Get in touch with the office listed below to find out if materials are available.

Client Services and Permissions Branch
Address

135 St Clair Ave West
1st Floor
Toronto, ON
M4V 1P5
Canada

Office phone number

Comment

Let us know what you think of our proposal.

Have questions? Get in touch with the contact person below. Please include the ERO number for this notice in your email or letter to the contact.

Read our commenting and privacy policies.

Submit online

Submit by mail

Contact

Connect with us

Contact

Sign up for notifications

We will send you email notifications with any updates related to this consultation. You can change your notification preferences anytime by visiting settings in your profile page.

Follow this notice