An Environmental Compliance Approval has been granted to Wesdome Gold Mines Ltd. The mine is located 70 kilometres south of Paint Road from Highway 17 in Wawa, Ontario.
January 31, 2024 - March 16, 2024 (45 days) Closed
Last updated
This proposal is for an amendment to the Environmental Compliance Approval (air & Noise) No. 2492-AWCKQ2 with Limited Operational Flexibility for Arnprior Aerospace Inc.. The application is withdrawn because the plant is currently shutdown, waiting for a sale.
November 14, 2018 - December 29, 2018 (45 days) Closed
Last updated
Super Sucker Hydro-Vac Service Inc. has requested to withdraw their application for a new Environmental Compliance Approval for a waste disposal site in Mississauga, Ontario.
February 6, 2024 - March 22, 2024 (45 days) Closed
Last updated
We issued an amendment to Titan Tool & Die Limited, for the operation of an automotive stamping, welding and assembly facility, located at 2801 Howard Avenue in Windsor, Ontario.
October 31, 2023 - December 15, 2023 (45 days) Closed
Last updated
A new Environmental Compliance Approval (air & noise) has been issued to Tramin Limited, a ready-mix concrete plant, located at 801 Highway 11B, Atikokan, Ontario.
October 27, 2023 - December 11, 2023 (45 days) Closed
Last updated
An Environmental Compliance Approval has been issued to Harbour Environmental Group (NW Calgary) Ltd., for a facility located on Ottawa, Ontario. The facility undertakes liquid soil processing.
October 27, 2023 - December 11, 2023 (45 days) Closed
Last updated
We issued an amended Environmental Compliance Approval with Limited Operational Flexibility (LOF) to Nestlé Canada Inc. to renew their Limited Operational Flexibility for their Facility located at 72 Sterling Road, 100 Sterling Road, 113 Sterling Road, and 1900 Dundas Street West, in Toronto, Ontario.
November 14, 2023 - December 29, 2023 (45 days) Closed
Last updated
An Environmental Compliance Approval with Limited Operational Flexibility (air & noise) has been granted to Continuous Colour Coat Limited, a coated metal products manufacturing facility, located at 1430 Martin Grove Road, Toronto, Ontario.
November 10, 2023 - December 25, 2023 (45 days) Closed
Last updated
An amended Environmental Compliance Approval (air & noise) with Limited Operational Flexibility was issued to Freudenberg-NOK, Inc., a manufacturing facility located in Tillsonburg, Ontario.
We issued an amended Environmental Compliance Approval with Limited Operational Flexibility (air) No. 2230-BD4PP7 to EIDCA Specialty Products Company in the City of Kingston, Ontario.
An amendment to Environmental Compliance Approval (air) No. 8794-8VFJ7B with operational flexibility was issued to FNX Mining Company Inc., an underground mine facility producing copper-nickel ore with recoverable platinum group metals located in the City of Greater Sudbury, Ontario.
We issued an amended Environmental Compliance Approval (air) with Limited Operational Flexibility to VPC Group Inc., a polyurethane foam products manufacturing facility, located at 150 Toro Road in North York, Ontario.
We have approved amendment to Environmental Compliance Approval (Air & Noise) No. 8080-6FJLJ7 for Waste Management of Canada Corporation, operating the Aurora landfill located in the Town of Arura, Ontario.
October 25, 2023 - December 9, 2023 (45 days) Closed
Last updated
An Environmental Compliance Approval with Limited Operational Flexibility was issued to Carpenter Canada Co., a foam manufacturing facility located at 500 Hanlan Road, in Vaughan, Ontario.
November 2, 2023 - December 17, 2023 (45 days) Closed
Last updated
We have approved the renewal of the Limited Operational Flexibility for an Environmental Compliance Approval (air & noise) No. 5718-9AYJBB for Aimco Solrec Limited, a waste solvent recycling facility located at 425 Morobel Drive in Milton in Ontario.
October 25, 2023 - December 9, 2023 (45 days) Closed
Last updated
We have issued a new multi-site Environmental Compliance Approval (geothermal) for 2068929 Ontario Inc., operating as Buchanan & Hall, to install vertical closed loop geothermal systems. Buchanan & Hall operates across Ontario drilling boreholes and installing closed loop geothermal heat exchangers in these boreholes.
October 18, 2023 - December 2, 2023 (45 days) Closed
Last updated
We have approved a new Environmental Compliance Approval No. 2936-DHGLJZ for York1 Tiffin Recycling Ltd. for the construction and operation of a waste disposal site (processing) located within a 1.639 hectares total site area located at 529 Tiffin Street in the City of Barrie.