Instrument type:
Approval for a consent (subject to conditions) in an area where there is no official plan in place
ERO number
019-8759
Notice type
Instrument
Notice stage
Decision
Decision posted
Proposal posted
Comment period
June 3, 2024 - July 3, 2024 (30 days) Closed
Last updated
Pursuant to Section 53 of the Planning Act, provisional consent for lot creation for the purpose of separating two existing houses on the subject property to provide a clear title to each, was granted on July 17, 2024, subject to conditions.
This decision is for the renewal of Permit to Take Water No. 8404-7YBLB2 for Gott Enterprises Inc. and is for water bottling purposes. The new issued permit No. 5457-CC74KJ was issued on September 13, 2022 with an expiry date of September 13, 2032.
November 30, 2023 - January 14, 2024 (45 days) Closed
Last updated
An approval was issued to amend Environmental Compliance Approval (air & noise) No. 2229-9FFK9G for the renewal of the Operational Flexibility conditions for Cameco Corporation, a uranium conversion facility, located at 1 Eldorado Place in Port Hope, Ontario.
An Environmental Compliance Approval with Limited Operational Flexibility (air & noise) was granted to 2231545 ONTARIO INC operating as Matrixx Specialized Trailers, for the operating site located at 470 Colborne Street West in Brantford, Ontario.
The facility production limit is 100 trailers per year.
We issued an amended Environmental Compliance Approval (Air) with Operational Flexibility to Johnson Electric Canada Ltd., a powdered metal components and fuel cells manufacturing facility located at 2430 Royal Windsor Drive, Mississauga, Ontario
Instrument type:
Order to comply with a site specific air standard
ERO number
019-2526
Notice type
Instrument
Notice stage
Decision
Decision posted
Proposal posted
Comment period
November 5, 2020 - December 20, 2020 (45 days) Closed
Last updated
This decision extends the time for Algoma Steel Inc. to complete the installation of emission controls for benzene by one year. The proposal was posted for 45 days to allow public input on this order to extend the time for these controls to be installed.
An Environmental Compliance Approval with Limited Operational Flexibility (air) was granted to BWXT Medical Ltd. The facility manufactures radioisotopes for medical use and is located at 447 March Road, Ottawa.
Instrument type:
Permit for activities to achieve an overall benefit to a species
ERO number
019-5324
Notice type
Instrument
Notice stage
Decision
Decision posted
Proposal posted
Comment period
April 19, 2022 - May 19, 2022 (30 days) Closed
Last updated
The minister has issued an overall benefit permit to the Regional Municipality of Halton to replace the existing East Sixteen Mile Creek Bridge, which will impact Silver Shiner, a species at risk fish. The permit includes actions to benefit the species and minimize adverse effects, and outlines monitoring and reporting requirements.
We decided to proceed with ending acetone reporting in Ontario. This will align us with the federal government and other provinces that have not required acetone release reporting since 1998 and reduce burden for business without compromising protection of human health and the environment.
We have approved updates to the assessment reports and source protection plan for the Thames-Sydenham and Region Source Protection Region. Proceeding with these updates will ensure the assessment reports and source protection plan are current and in place to protect sources of drinking water for the region.
November 16, 2023 - December 8, 2023 (30 days) Closed
Last updated
A decision has been made to enact the Planning Statute Law Amendment Act, 2023, which would help ensure that official plan decisions support our goal of building at least 1.5 million homes in a manner that maintains and reinforces public trust.
The Minister has issued a new market-based LNA Methodology for the Greater Golden Horseshoe (2020) which supports implementation of A Place to Grow (“the Plan”). This sets out how upper- and single-tier municipalities in the Greater Golden Horseshoe will determine the amount of land they require to accommodate forecasted growth to the Plan horizon.
We have decided to give fuel suppliers the option to defer compliance with the 2025 domestic content requirement until the 2026 compliance period. This regulatory amendment is effective immediately.
We have issued an Environmental Compliance Approval with Limited Operational Flexibility (air & noise) to Designed Precision Castings Inc., an investment casting foundry, located at 75 Eastern Avenue, Brampton, Ontario.
The Minister of the Environment, Conservation and Parks is inviting stakeholders, Indigenous communities and the public to participate in our 10-year review of the Lake Simcoe Protection Plan to see if updates need to be made to continue to protect and restore the lake.