Just trying to understand…

Comment

 Just trying to understand the mechanism in a VNM behind the meter configuration. Does the retailer have to own the grid tied meter (the existing Utility Meter). Does the retailer have to own all meters generating or consuming for the VNM configuration.

  Customer A - uses a 1MWh per year ,

  Config 1 netmeter 500kWh and off site 500 kWh (direct grid connect)

  Config 2 500kWh Netmeter  and offsite 500kWh netmeter (Customer B)

  Is the meter on Customer B site for generation registered as the VNM for customer A?

  Does this mean that all meters would have to administered by the LDC and be included in the MDMR?

  Thank you.

  Bill

[Original Comment ID: 211666]