Cette consultation se termine à 23 h 59 le :
3 février 2025
Résumé de la proposition
James Thoume Construction Ltd. has applied for a licence to operate a pit above the water table in the Township of Centre Wellington.
Détails de l'emplacement
Détails de l'emplacement du site
Township of Centre Wellington, Wellington County
Part of Lots 11 & 12, Concession 4 West, Geographic Township of Pilkington.
This site has coordinates at Latitude 43.60134° N Longitude 80.40794° W.
This site is located approximately 4.5 km Northwest of the Town of Ariss.
A link to our mapping tool allows you to locate and view licensed sites under the ARA.
Carte de l'emplacement du site
L'épingle de localisation correspond à la zone approximative où a lieu l’activité environnementale.
Afficher cet emplacement sur une carte opens link in a new windowPromoteur(s)
James Thoume Construction Ltd.
7270 Side Road 14
Ariss,
ON
N0B 1B0
Canada
Détails de la proposition
James Thoume Construction Ltd. has applied for a Class A licence, Above the Water Table, to excavate aggregate from a pit of 42.7 hectares in size with an extraction area of 29.1 hectares.
This application is for the establishment of a new pit. The annual tonnage condition applied for is 100,000 tonnes.
The extraction of aggregate from a pit or quarry on private land designated by regulation, in the Province of Ontario, requires the issuance of a licence. Ontario Regulation 244/97 and the Aggregate Resources of Ontario Standards set out the application process and requirements.
For each new licence, the applicant must provide information (site plan, summary statement, technical reports) with respect to the existing features, operation and rehabilitation of the site to demonstrate that the proposed operation will minimize adverse impact on the environment.
For this proposal, the following information has been prepared and submitted to the Ministry of Natural Resources (MNR):
- Site plan
- Summary Statement
- Natural Environment Report
- Maximum Predicted Water Table Report
- Cultural Heritage Report
- Noise Assessment Report
The Site Plan addresses existing features of the pit and/or quarry area (existing natural features and land use on and surrounding the site within 120 meters); the proposed operation (shape, dimensions, area and depth to be excavated, method of extraction); and progressive and final rehabilitation.
The Summary Statement includes information on one or more of the following considerations: land use planning, agricultural classification, quality and quantity of aggregate, haul routes, truck traffic and entrance permits, progressive and final rehabilitation, surface water, and elevation of the established groundwater table.
The Natural Environment Report identifies the presence of significant natural heritage features/areas that exist on the site or within 120 meters of the site. Where any of the features or areas have been identified, the report must identify and evaluate any negative impacts on the features or areas and ecological functions, and identify any proposed preventative, mitigative or remedial measures. The report must also identify if the application site or any of the features are located within a natural heritage system that has been identified by a municipality in ecoregions 6E and 7E or by the province as part of a provincial plan.
The Cultural Heritage Report must be consistent with provincial requirements under the Ontario Heritage Act and the Provincial Policy Statement. Screening checklists evaluating the potential for archaeological resources, built heritage and cultural heritage landscapes, with supporting documentation, is required. Where screening indicates that assessments are requirement to be completed, the assessment reports and letters from the Ministry of Citizenship and Multiculturalism must be obtained.
A report must be prepared that details how the maximum predicted water table is identified in metres above sea level, relative to the proposed depth of excavation at the site.
Applications proposing to excavate below the maximum predicted water table must complete a Water Report. Level 1 determines the potential for impacts to ground water and surface water resources and their uses. If the Level 1 identifies a potential for impacts resulting from the operation, then an impact assessment (Level 2) is required to determine the significance of the effect and potential for mitigation.
A Noise Assessment report is prepared if proposed excavation and/or processing facilities are within 150 meters (for pit applications) or 500 meters (for quarry applications) of a sensitive receptor. The report is required to determine whether provincial guidelines for Stationary and Transportation Sources can be satisfied.
The Ministry reviews all comments received through the Environmental Registry and the notification and consultation process under the Aggregate Resources Act (ARA), and considers them before making a decision. Comments received through the Environmental Registry are considered by the Ministry however, the process under the ARA is proponent driven. This means that comments for consideration by the applicant under the ARA process must be submitted to the applicant and the Ministry during the 60-day consultation period initiated by the applicant.
Details of the application process can be found in Ontario Regulation 244/97 under the ARA and on the Ministry website at aggregate resources\ontario.ca. Many regulatory changes for new applications took effect on April 1, 2021. This means that applications submitted after March 31, 2021, must meet the new requirements in Ontario Regulation 244/97 and Aggregate Resources of Ontario Standards.
Public consultation opportunities
Written notice concerning this application was delivered to landowners within 120 meters of the proposed licensed boundary; an information sign, giving notice to the public of this application, was erected at the proposed site; and a Public Notice of Application appeared in the local paper, the Wellington Advertiser on November 7, 2024.
The information submitted in support of this application can be viewed at https://www.thoume.ca. A public information session was held on November 22, 2024 from 3:00 to 5:00 p.m. to provide information to the public and answer questions related to the application. For more information on this application, please email: Info@Thoume.ca.
The application for this licence is being circulated within the Ministry of Natural Resources. Additionally, notification of this application has been forwarded to the County of Wellington, Township of Centre Wellington, Grand River Conservation Authority (GRCA), Bell Canada, Hydro One, Enbridge Gas Inc., Ministry of Agriculture, Food and Agribusiness (OMAFA) and Ministry of the Environment, Conservation and Parks (MECP), and Department of Fisheries and Oceans Canada (DFO) for comment.
Documents justificatifs
Consulter les documents en personne
Certains documents justificatifs peuvent ne pas être accessibles en ligne. Si tel est le cas, vous pouvez demander à consulter les documents en personne.
Veuillez communiquer avec le bureau mentionné ci-dessous pour savoir si les documents sont accessibles.
300 Water Street, 4th Floor, South tower
Peterborough,
ON
K9J 3C7
Canada
Communiquer avec nous
Contact
Steve McKeown
300 Water Street, 4th Floor, South tower
Peterborough,
ON
K9J 3C7
Canada
Commentaire
Dites-nous ce que vous pensez de notre proposition.
Vous avez des questions? Contactez la personne-ressource indiquée ci-dessous. Veuillez indiquer le numéro du REO de l’avis dans votre courriel ou votre lettre à la personne-ressource.Lire nos politiques relatives aux commentaires et à la protection de la vie privée.
Soumettre en ligne
Soumettre par la poste
Contact
Steve McKeown
300 Water Street, 4th Floor, South tower
Peterborough, ON
K9J 3C7
Canada