Résumé de la décision
Sunquest Farms Ltd. has requested to withdraw their application for an Environmental Compliance Approval for an existing greenhouse stormwater management facility in the Town of Kingsville, County of Essex, Ontario.
Détails de l'emplacement
Adresse du site
1254 Road 3 East
County of Essex
Kingsville,
ON
N9Y 2E5
Canada
Carte de l'emplacement du site
L'épingle de localisation correspond à la zone approximative où a lieu l’activité environnementale.
Afficher cet emplacement sur une carte opens link in a new windowPromoteur(s)
Sunquest Farms Ltd.
1254 Road 3 East
Kingsville,
ON
N9Y 2E5
Canada
Détails de la décision
On October 22, 2019, Sunquest Farms Ltd. requested to formally withdraw their Environmental Compliance Approval application. We have withdrawn the application and closed the file.
Documents justificatifs
Consulter les documents en personne
Certains documents justificatifs peuvent ne pas être accessibles en ligne. Si tel est le cas, vous pouvez demander à consulter les documents en personne.
Veuillez communiquer avec le bureau mentionné ci-dessous pour savoir si les documents sont accessibles.
135 St Clair Ave West
1st Floor
Toronto,
ON
M4V 1P5
Canada
4510 Rhodes Drive
Unit 620
Windsor,
ON
N8W 5K5
Canada
How to Appeal
Appeals are not allowed
There is no mechanism to appeal an application which has been withdrawn.
Communiquer avec nous
Contact
Client Services and Permissions Branch
135 St Clair Ave West
1st Floor
Toronto,
ON
M4V 1P5
Canada
Proposition initiale
Détails de la proposition
Description of instrument
This proposal is for a new Environmental Compliance Approval for an existing greenhouse stormwater management facility serving Sunquest Farms Ltd., located at 1254 Road 3 East, Town of Kingsville, County of Essex.
The existing stormwater structure includes a roof water drainage pipe system, a wet pond having a storage volume of 2,361 cubic metres with a maximum depth of 0.956 metres for the 100-year storm event, complete with a 240 millimetre diameter outlet pipe and emergency spillway discharging with a maximum release rate of 157.72 litres per second for the 100-year storm event into the East 3rd Concession Drain.
Other information
Environmental Compliance Approvals (ECAs) for greenhouse stormwater management facilities follow a streamlined process set forth in the Guide: Obtaining Approval for a Greenhouse Stormwater Management Facility. Many greenhouses for which applications are being submitted have already been in operation for several years; most stormwater management systems for greenhouses are not highly complex; and the ECAs are being submitted as part of a ministry abatement action plan to address water quality issues as quickly as possible. Therefore, the Director feels a 31-day comment period is sufficient for this and all other greenhouse stormwater ECA applications as opposed to the 45-day comment period used on other types of ECA applications.
Documents justificatifs
Consulter les documents en personne
Certains documents justificatifs peuvent ne pas être accessibles en ligne. Si tel est le cas, vous pouvez demander à consulter les documents en personne.
Veuillez communiquer avec le bureau mentionné ci-dessous pour savoir si les documents sont accessibles.
135 St Clair Ave West
1st Floor
Toronto,
ON
M4V 1P5
Canada
4510 Rhodes Drive
Unit 620
Windsor,
ON
N8W 5K5
Canada
Commentaire
La consultation est maintenant terminée.
Cette consultation a eu lieu 1 octobre 2018
au 1 novembre 2018
Communiquer avec nous
Contact
Client Services and Permissions Branch
135 St Clair Ave West
1st Floor
Toronto,
ON
M4V 1P5
Canada
Commentaires reçus
Par l'entremise du registre
0Par courriel
0Par la poste
0