Decision summary
Sunquest Farms Ltd. has requested to withdraw their application for an Environmental Compliance Approval for an existing greenhouse stormwater management facility in the Town of Kingsville, County of Essex, Ontario.
Location details
Site address
1254 Road 3 East
County of Essex
Kingsville,
ON
N9Y 2E5
Canada
Site location map
The location pin reflects the approximate area where environmental activity is taking place.
View this location on a map opens link in a new windowProponent(s)
Sunquest Farms Ltd.
1254 Road 3 East
Kingsville,
ON
N9Y 2E5
Canada
Decision details
On October 22, 2019, Sunquest Farms Ltd. requested to formally withdraw their Environmental Compliance Approval application. We have withdrawn the application and closed the file.
Supporting materials
View materials in person
Some supporting materials may not be available online. If this is the case, you can request to view the materials in person.
Get in touch with the office listed below to find out if materials are available.
135 St Clair Ave West
1st Floor
Toronto,
ON
M4V 1P5
Canada
4510 Rhodes Drive
Unit 620
Windsor,
ON
N8W 5K5
Canada
How to Appeal
Appeals are not allowed
There is no mechanism to appeal an application which has been withdrawn.
Connect with us
Contact
Client Services and Permissions Branch
135 St Clair Ave West
1st Floor
Toronto,
ON
M4V 1P5
Canada
Original proposal
Proposal details
Description of instrument
This proposal is for a new Environmental Compliance Approval for an existing greenhouse stormwater management facility serving Sunquest Farms Ltd., located at 1254 Road 3 East, Town of Kingsville, County of Essex.
The existing stormwater structure includes a roof water drainage pipe system, a wet pond having a storage volume of 2,361 cubic metres with a maximum depth of 0.956 metres for the 100-year storm event, complete with a 240 millimetre diameter outlet pipe and emergency spillway discharging with a maximum release rate of 157.72 litres per second for the 100-year storm event into the East 3rd Concession Drain.
Other information
Environmental Compliance Approvals (ECAs) for greenhouse stormwater management facilities follow a streamlined process set forth in the Guide: Obtaining Approval for a Greenhouse Stormwater Management Facility. Many greenhouses for which applications are being submitted have already been in operation for several years; most stormwater management systems for greenhouses are not highly complex; and the ECAs are being submitted as part of a ministry abatement action plan to address water quality issues as quickly as possible. Therefore, the Director feels a 31-day comment period is sufficient for this and all other greenhouse stormwater ECA applications as opposed to the 45-day comment period used on other types of ECA applications.
Supporting materials
View materials in person
Some supporting materials may not be available online. If this is the case, you can request to view the materials in person.
Get in touch with the office listed below to find out if materials are available.
135 St Clair Ave West
1st Floor
Toronto,
ON
M4V 1P5
Canada
4510 Rhodes Drive
Unit 620
Windsor,
ON
N8W 5K5
Canada
Comment
Commenting is now closed.
This consultation was open from October 1, 2018
to November 1, 2018
Connect with us
Contact
Client Services and Permissions Branch
135 St Clair Ave West
1st Floor
Toronto,
ON
M4V 1P5
Canada
Comments received
Through the registry
0By email
0By mail