Commentaire
The concept for the recycling is not my complaint. We need to do more to protect the environment. I have seen the construction materials that are dumped at the Ridge Landfill in Chatham-Kent and if a recycling centre could divert that waste it’s a good thing.
The problem is that the site chosen is too close to the town and waterways. There are better places even in Chatham-Kent. The volume of traffic from the trucks would be detrimental to the town. The concept of it running 24/7 carries concerns for noise & possible light pollution
And yes, accidental poising of land & water in the vicinity is a huge concern.
The request for an environmental impact assessment is NOT without merit and waiving that requirement certainly leads to questions about legality’s, corruption and kickbacks!!!!
Soumis le 19 avril 2025 8:00 AM
Commentaire sur
Élimination des exigences en matière d’évaluation environnementale pour le projet de site d’élimination des déchets de York1
Numéro du REO
025-0389
Identifiant (ID) du commentaire
126233
Commentaire fait au nom
Statut du commentaire