Commentaire
Hello,
Please ensure there is a section included in the Planning Act that states the following as it relates to Trans-Northern Pipeline Inc.:
- protection for Right-of-way (ROW) for current and future projected needs
– recognize that increased population growth may impact our pipelines and might drive our need to upgrade/replace pipeline portion. Early consultation recommended within 200m to recognize potential impacts on the pipeline industry, striving to avoid adverse impacts to energy infrastructure
- CER Prescribed Area of 30m from the pipeline, requiring authorization within this area
- Setbacks to be determined based on the type of pipeline and stress level of the pipeline with consultation with the pipeline operator - we recommend 10 m from the ROW boundary
-Easements to be incorporated into development plans, recommending open spaces, walkways and not to be incorporated into individual lots. Consultation with operator and written consent for right-of-way or near the right-of-way.
Additionally, all proposals for development within 200 m from the TNPI pipeline, are requested to send proposals to landroweast@tnpi.ca
TNPI would like to thank the City of Toronto for the opportunity to contribute to the planning process and a joint effort ensures that appropriate development is planned in the areas affected by the TNPI pipeline.
Thank you,
Michelle Gruszecki
Trans-Northern Pipelines Inc
Soumis le 5 juin 2025 4:28 PM
Commentaire sur
Modifications proposées à la Loi sur l'aménagement du territoire et à la Loi de 2006 sur la cité de Toronto (annexes 3 et 7 du projet de loi 17 – Loi de 2025 pour protéger l’Ontario en construisant plus rapidement et plus efficacement)
Numéro du REO
025-0461
Identifiant (ID) du commentaire
149539
Commentaire fait au nom
Statut du commentaire