Commentaire
Ontario has lots of development lands that are unfit for agriculture or are poor quality soils.
The Caister Clay soil makes the land above the escarpment in Niagara ideal. The only obstacles are political and highway access. The mid peninsula highway corridor has been approved by several environmental assessments and is yet unrealized.
Similarly the intersection at the QEW and Bartlett Road in Grimsby sits unused since 1972, due to politicians who live in the path of the extension up the escarpment.
Get busy with real options that are not GTA based. The Niagara Region has been ignored by the OMB and the provincial governments for too long.
Soumis le 15 novembre 2022 9:09 PM
Commentaire sur
Décision sur les modifications proposées au règlement sur la désignation de la zone de la ceinture de verdure
Numéro du REO
019-6217
Identifiant (ID) du commentaire
69086
Commentaire fait au nom
Statut du commentaire