Commentaire
Some of the proposed amendments to Reg. 406/19 are an injustice to the companies that made enormous investment, to develop innovative and new technologies to support the MECP’s objectives. More specifically, we are referring to the proposed small liquid soil depot and exemption from Environmental Compliance Approval (ECA). 200m3 of liquid soil is not a small operation and it is naive to expect that all small liquid soil depots will operate within compliance without clear direction and oversight through a formal approval process at the provincial level. There is no consistency in the approval process at the regional and municipal level. What is permitted in one municipality, is not permitted in another. A provincial approval process is required to meet the goals of Reg. 406/19, and to maintain a uniform process for the liquid soil management industry across the entire province.
Supporting documents
Soumis le 1 décembre 2023 8:57 PM
Commentaire sur
Proposition de modifications réglementaires visant à encourager une plus grande réutilisation des sols de déblai
Numéro du REO
019-7636
Identifiant (ID) du commentaire
95164
Commentaire fait au nom
Statut du commentaire