TransAlta Cogeneration Ltd. as general partner for and on behalf of TransAlta Cogeneration L.P. - Environmental Compliance Approval (air)

La traduction française de cet avis n'est pas disponible. Nous nous excusons pour le dérangement.

Type d'acte: Environmental Compliance Approval (air)

Numéro du REO
019-9311
Numéro de référence du ministère
5479-D9EGE5
Type d'avis
Instrument
Loi
Environmental Protection Act, R.S.O. 1990
Affiché par
Ministry of the Environment, Conservation and Parks
Étape de l'avis
Proposition
Proposition affichée
Période de consultation
Du 28 octobre 2024 au 12 décembre 2024 (45 jours) Ouvert
Dernière mise à jour

Cette consultation se termine à 23 h 59 le :
12 décembre 2024

Résumé de la proposition

This proposal is for the renewal of the Limited Operational Flexibility for an Environmental Compliance Approval (air & noise) No. 6245-9CBRLP for TransAlta Cogeneration Ltd., as general partner for and on behalf of TransAlta Cogeneration L.P., a co-generation plant, located in the City of Ottawa, Ontario.

Détails de l'emplacement

Adresse du site

405 Smyth Road
Ottawa, ON
Canada

Carte de l'emplacement du site

L'épingle de localisation correspond à la zone approximative où a lieu l’activité environnementale.

Afficher cet emplacement sur une carte opens link in a new window

Promoteur(s)

TransAlta Cogeneration Ltd. as general partner for and on behalf of TransAlta Cogeneration L.P.
405 Smyth Road
Ottawa, ON
K1H 8M8
Canada

Détails de la proposition

This proposal is for the renewal of the Limited Operational Flexibility for an Environmental Compliance Approval (air & noise) No. 6245-9CBRLP for TransAlta Cogeneration Ltd., as general partner for and on behalf of TransAlta Cogeneration L.P., a co-generation plant, located in the City of Ottawa, Ontario. This proposal includes all emission sources from the manufacturing and associated processes that exhaust to the atmosphere including raw materials handling, power and steam generation, heat recovery and other auxiliary processes and equipment. Emissions to the atmosphere from this facility include:

  • particulate matter,
  • nickel,
  • hydrotreated light naphthenic distillate, and
  • products of combustion such as nitrogen oxides, and carbon monoxide

The Environmental Compliance Approval with Limited Operational Flexibility (air), when issued, permits modifications to the facility subject to limits on operational flexibility that include a production limit for the facility to be specified on the Environmental Compliance Approval with Limited Operational Flexibility (air). The limited operational flexibility conditions have an expiry date. The company will be required to make an application for amendment at that time to renew these conditions.

Documents justificatifs

Consulter les documents en personne

Certains documents justificatifs peuvent ne pas être accessibles en ligne. Si tel est le cas, vous pouvez demander à consulter les documents en personne.

Veuillez communiquer avec le bureau mentionné ci-dessous pour savoir si les documents sont accessibles.

Client Services and Permissions Branch
Address

135 St Clair Ave West
1st Floor
Toronto, ON
M4V 1P5
Canada

Office phone number

Commentaire

Dites-nous ce que vous pensez de notre proposition.

Vous avez des questions? Contactez la personne-ressource indiquée ci-dessous. Veuillez indiquer le numéro du REO de l’avis dans votre courriel ou votre lettre à la personne-ressource.

Lire nos politiques relatives aux commentaires et à la protection de la vie privée.

Soumettre en ligne

Soumettre par la poste

Contact

Communiquer avec nous

Contact

S'inscrire pour obtenir des avis

Nous vous enverrons des avis par courriel accompagnés de toute mise à jour liée à cette consultation. Vous pouvez modifier vos préférences relatives à l'avis en tout temps en allant à votre page de profil où se trouvent vos paramètres.

Suivre cet avis