Résumé de la proposition
The Ministry of Mines is considering, subject to the approval of the Lieutenant Governor in Council, issuing an unpatented boundary mining claim under subsection 176(3) of the Mining Act to EV Nickel Inc., for land in Langmuir Township within provincial grid cell number 42A06H380, covering the east part of the former Langmuir mine.
Détails de l'emplacement
Détails de l'emplacement du site
There is no municipal street address. The requested mining rights are situated within provincial grid cell number 42A06H380, Timmins, Ontario, Township of Langmuir.
Carte de l'emplacement du site
L'épingle de localisation correspond à la zone approximative où a lieu l’activité environnementale.
Afficher cet emplacement sur une carte opens link in a new windowPromoteur(s)
EV Nickel Inc.
150 King St. W
Suite 200
Toronto,
ON
M5H 1J9
Canada
Détails de la proposition
There are currently two registered boundary claims held by separate claimholders within boundary cell 42A06H380 in the geographic Township of Langmuir, situated over a part of the abandoned Langmuir Mine. Within this boundary cell there is also approximately 14.79 hectares of mining lands where no mining claim is currently registered. These mining lands are currently open for claim registration; however, subsection 38(3) of the Mining Act only permits a licensee to register cell claims that are not boundary claims. Because there are two existing boundary claims within the cell, the 14.79 hectares cannot be registered as a cell claim and is therefore unavailable for claim registration.
EV Nickel Inc. has requested that the Minister of Mines issue an unpatented mining claim covering the 14.79 hectares that are currently unavailable for claim registration under subsection 176(3) of the Mining Act.
EV Nickel Inc. has informed the Ministry that the requested area is integral to its intention of expanding current exploration activities occurring on adjacent mining claims and to further develop prospective high-grade targets. The Langmuir mine operated from 1973 to 1978 where two million tons of nickel ore was mined.
The Ministry does not anticipate any new environmental impacts associated with the issuance of an unpatented mining claim, given the small size of the area, the area being adjacent to the applicant’s existing boundary claim, and since activities on the claim are subject to other regulatory authorizations and requirements that govern environmental impacts.
The issuance of an unpatented boundary mining claim under subsection 176(3) of the Mining Act requires the approval of the Lieutenant Governor in Council and is subject to terms and conditions as the Minister considers appropriate.
Documents justificatifs
Consulter les documents en personne
Certains documents justificatifs peuvent ne pas être accessibles en ligne. Si tel est le cas, vous pouvez demander à consulter les documents en personne.
Veuillez communiquer avec le bureau mentionné ci-dessous pour savoir si les documents sont accessibles.
Communiquer avec nous
Contact
Lisette Prudhomme
Willet Green Miller Ctr Bldg B Level B3, 933 Ramsey Lake Rd
Sudbury,
ON
P3E 6B5
Canada
Commentaire
Dites-nous ce que vous pensez de notre proposition.
Vous avez des questions? Contactez la personne-ressource indiquée ci-dessous. Veuillez indiquer le numéro du REO de l’avis dans votre courriel ou votre lettre à la personne-ressource.Lire nos politiques relatives aux commentaires et à la protection de la vie privée.
Soumettre en ligne
Soumettre par la poste
Contact
Lisette Prudhomme
Willet Green Miller Ctr Bldg B Level B3, 933 Ramsey Lake Rd
Sudbury, ON
P3E 6B5
Canada