Williams Operating Corporation - Permit to take water

La traduction française de cet avis n'est pas disponible. Nous nous excusons pour le dérangement.

Type d'acte: Permit to take water

Numéro du REO
025-0842
Numéro de référence du ministère
7726-DJ6RU2
Type d'avis
Instrument
Loi
Ontario Water Resources Act, R.S.O. 1990
Affiché par
Ministry of the Environment, Conservation and Parks
Étape de l'avis
Proposition
Proposition affichée
Période de consultation
Du 22 juillet 2025 au 21 août 2025 (30 jours) Fermé
Dernière mise à jour

Cette consultation a eu lieu :

du 22 juillet 2025
au 21 août 2025

Résumé de la proposition

This proposal is for a renewal Permit to Take Water No. 5533-A2LMPA for industrial and water supply purposes. Water will be taken from Cedar Creek in Bomby, Ontario.

Détails de l'emplacement

Adresse du site

Highway 17, 4.5 km West of Junction of Highway 614 & Highway 17, 40 km East of Marathon
Bomby, ON
Canada

Carte de l'emplacement du site

L'épingle de localisation correspond à la zone approximative où a lieu l’activité environnementale.

Afficher cet emplacement sur une carte opens link in a new window

Promoteur(s)

Williams Operating Corporation
Highway 17, P.O. Bag 500
Bomby, ON
P0T 2E0
Canada

Détails de la proposition

This proposal is for a renewal Permit to Take Water No. 5533-A2LMPA for industrial and water supply purposes. Water will be taken from Cedar Creek in Bomby, Ontario. Details of the water taking are as follows:

Permit type – renewal

Source of water: Cedar Creek

  • purpose of taking: industrial
  • maximum rate per minute (litres): 6,602
  • maximum number of hours of taking per day: 24
  • maximum volume per day (litres): 9,506,240
  • maximum number of days of taking per year: 365
  • earliest calendar date of taking (mm/dd): 01/01
  • latest calendar date of taking (mm/dd): 12/31
  • length of time: 10 years

Source of water: Cedar Creek

  • purpose of taking: communal/water supply
  • maximum rate per minute (litres): 204
  • maximum number of hours of taking per day: 24
  • maximum volume per day (litres): 294,320
  • maximum number of days of taking per year: 365
  • earliest calendar date of taking (mm/dd): 01/01
  • latest calendar date of taking (mm/dd): 12/31
  • length of time: 10 years

There are 3 categories of a Permit to Take Water:

  • Category 1: water takings are anticipated to have a lower risk of causing an unacceptable environmental impact/interference
  • Category 2: water takings are anticipated to having a higher potential of causing unacceptable environmental impact or interference
  • Category 3: water takings are anticipated to have the highest potential of causing unacceptable environmental impactor interference

The proposed water taking qualifies as a Category 1 permit.

Documents justificatifs

Consulter les documents en personne

Certains documents justificatifs peuvent ne pas être accessibles en ligne. Si tel est le cas, vous pouvez demander à consulter les documents en personne.

Veuillez communiquer avec le bureau mentionné ci-dessous pour savoir si les documents sont accessibles.

Client Services and Permissions Branch
Address

135 St Clair Ave West
1st Floor
Toronto, ON
M4V 1P5
Canada

Office phone number

Commentaire

La consultation est maintenant terminée.

La période de consultation a eu lieu du 22 juillet 2025
au 21 août 2025

Communiquer avec nous

Contact

S'inscrire pour obtenir des avis

Nous vous enverrons des avis par courriel accompagnés de toute mise à jour liée à cette consultation. Vous pouvez modifier vos préférences relatives à l'avis en tout temps en allant à votre page de profil où se trouvent vos paramètres.

Suivre cet avis