Williams Operating Corporation - Permit to take water

Instrument type: Permit to take water

ERO number
025-0842
Ministry reference number
7726-DJ6RU2
Notice type
Instrument
Act
Ontario Water Resources Act, R.S.O. 1990
Posted by
Ministry of the Environment, Conservation and Parks
Notice stage
Proposal
Proposal posted
Comment period
July 22, 2025 - August 21, 2025 (30 days) Closed
Last updated

This consultation was open from:

July 22, 2025
to August 21, 2025

Proposal summary

This proposal is for a renewal Permit to Take Water No. 5533-A2LMPA for industrial and water supply purposes. Water will be taken from Cedar Creek in Bomby, Ontario.

Location details

Site address

Highway 17, 4.5 km West of Junction of Highway 614 & Highway 17, 40 km East of Marathon
Bomby, ON
Canada

Site location map

The location pin reflects the approximate area where environmental activity is taking place.

View this location on a map opens link in a new window

Proponent(s)

Williams Operating Corporation
Highway 17, P.O. Bag 500
Bomby, ON
P0T 2E0
Canada

Proposal details

This proposal is for a renewal Permit to Take Water No. 5533-A2LMPA for industrial and water supply purposes. Water will be taken from Cedar Creek in Bomby, Ontario. Details of the water taking are as follows:

Permit type – renewal

Source of water: Cedar Creek

  • purpose of taking: industrial
  • maximum rate per minute (litres): 6,602
  • maximum number of hours of taking per day: 24
  • maximum volume per day (litres): 9,506,240
  • maximum number of days of taking per year: 365
  • earliest calendar date of taking (mm/dd): 01/01
  • latest calendar date of taking (mm/dd): 12/31
  • length of time: 10 years

Source of water: Cedar Creek

  • purpose of taking: communal/water supply
  • maximum rate per minute (litres): 204
  • maximum number of hours of taking per day: 24
  • maximum volume per day (litres): 294,320
  • maximum number of days of taking per year: 365
  • earliest calendar date of taking (mm/dd): 01/01
  • latest calendar date of taking (mm/dd): 12/31
  • length of time: 10 years

There are 3 categories of a Permit to Take Water:

  • Category 1: water takings are anticipated to have a lower risk of causing an unacceptable environmental impact/interference
  • Category 2: water takings are anticipated to having a higher potential of causing unacceptable environmental impact or interference
  • Category 3: water takings are anticipated to have the highest potential of causing unacceptable environmental impactor interference

The proposed water taking qualifies as a Category 1 permit.

Supporting materials

View materials in person

Some supporting materials may not be available online. If this is the case, you can request to view the materials in person.

Get in touch with the office listed below to find out if materials are available.

Client Services and Permissions Branch
Address

135 St Clair Ave West
1st Floor
Toronto, ON
M4V 1P5
Canada

Office phone number

Comment

Commenting is now closed.

The comment period was from July 22, 2025
to August 21, 2025

Connect with us

Contact

Sign up for notifications

We will send you email notifications with any updates related to this consultation. You can change your notification preferences anytime by visiting settings in your profile page.

Follow this notice