Instrument type:
Issuance of a licence to remove over 20,000 tonnes of aggregate annually from a pit or a quarry
ERO number
019-3450
Notice type
Instrument
Notice stage
ProposalUpdated
Proposal posted
Comment period
March 31, 2021 - May 17, 2021 (47 days) Closed
Last updated
Port Colborne Quarries Inc. has applied for a licence to operate a quarry below the water table from a site 106.3 hectares in size in the City of Port Colborne.
Instrument type:
Issuance of a licence to remove over 20,000 tonnes of aggregate annually from a pit or a quarry
ERO number
019-3337
Notice type
Instrument
Notice stage
ProposalUpdated
Proposal posted
Comment period
March 15, 2021 - April 29, 2021 (45 days) Closed
Last updated
CBM Aggregates, A Division of St. Marys Cement Inc. (Canada) has applied for a licence to operate a pit below the water table from a site 14.8 hectares in size in the Township of Puslinch.
Instrument type:
Issuance of a licence to remove over 20,000 tonnes of aggregate annually from a pit or a quarry
ERO number
013-4843
Notice type
Instrument
Notice stage
ProposalUpdated
Proposal posted
Comment period
March 7, 2019 - April 22, 2019 (46 days) Closed
Last updated
Big Island Quarries Inc. has applied for a Class A licence (Category 2 – Quarry Below Water) to excavate aggregate from a quarry of 10 hectares in size with an extraction area of 4.9 hectares. This application is for the establishment of a new quarry. The maximum annual tonnage applied for is 40,000 tonnes.
Instrument type:
Issuance of a licence to remove over 20,000 tonnes of aggregate annually from a pit or a quarry
ERO number
012-9181
Notice type
Instrument
Notice stage
ProposalUpdated
Proposal posted
Comment period
November 29, 2016 - January 13, 2017 (45 days) Closed
Last updated
Greenwood Aggregates Company Ltd. has applied for a Class “A” licence (Pit Above Water) to excavate aggregate from a pit 146.5 hectares in size. This application is for the establishment of a new pit. The annual tonnage condition applied for is 1,000,000 tonnes.
Instrument type:
Issuance of a licence to remove over 20,000 tonnes of aggregate annually from a pit or a quarry
ERO number
012-9139
Notice type
Instrument
Notice stage
ProposalUpdated
Proposal posted
Comment period
November 30, 2016 - January 16, 2017 (47 days) Closed
Last updated
Donegan’s Haulage Limited has applied for a Class A licence to extract aggregate from above the water table in a pit that is 39.6 hectares in size. This application is for the establishment of a new pit. The annual tonnage condition applied for is 400,000 tonnes per calendar year.
Instrument type:
Changes to the site plan for a pit or quarry
ERO number
012-9051
Notice type
Instrument
Notice stage
ProposalUpdated
Proposal posted
Comment period
November 15, 2016 - December 15, 2016 (45 days) Closed
Last updated
Application has been made by Hanna & Hamilton Construction Co. Limited to amend the current site plan to allow an increase in the number of tonnes of aggregate to be removed in a calendar year. The licensee has requested that the tonnage limit be increased from 150,000 tonnes to 400,000 tonnes annually.
Instrument type:
Changes to the site plan for a pit or quarry
ERO number
012-7402
Notice type
Instrument
Notice stage
ProposalUpdated
Proposal posted
Comment period
April 19, 2016 - June 3, 2016 (45 days) Closed
Last updated
An application has been made by Owen Sound Ledgerock Ltd. to amend their site plan to allow extraction to occur below the established water table. The licensee discovered that the water table at this quarry was at a higher elevation than was originally recorded.
Instrument type:
Issuance of a licence to remove over 20,000 tonnes of aggregate annually from a pit or a quarry
ERO number
011-5886
Notice type
Instrument
Notice stage
ProposalUpdated
Proposal posted
Comment period
March 7, 2012 - April 6, 2012 (30 days) Closed
Last updated
Dewdney Mountain Farms Ltd. (c/o Paul Ritchie) has applied for a Class “A” licence, Category 4 (Quarry above Water) to excavate consolidated aggregate material from a limestone quarry of 175.0 hectares in size. This application is to establish a new quarry. The annual tonnage condition applied for is unlimited tonnage.
Instrument type:
Issuance of a licence to remove over 20,000 tonnes of aggregate annually from a pit or a quarry
ERO number
011-0948
Notice type
Instrument
Notice stage
ProposalUpdated
Proposal posted
Comment period
August 25, 2010 - September 24, 2010 (30 days) Closed
Last updated
Glen Thompson has applied for a Class “A” licence to operate a Category 2 & 3 (quarry below water table & pit above water table) to excavate aggregate from an 81 hectare site.
An amended Environmental Compliance Approval has been issued to Terra Nova Environmental Services Inc., for one mobile in-situ remediation system to be used throughout Ontario.
December 5, 2023 - January 19, 2024 (45 days) Closed
Last updated
An Environmental Compliance Approval (air & noise) has been issued to the City of Toronto for one landfill gas venting system serving the closed Donlands Landfill.
An amended Environmental Compliance Approval has been issued to Geo Tactical Remediation Ltd. for one mobile in-situ remediation system to be used throughout Ontario.
An amended Environmental Compliance Approval (air & noise) has been issued to GFL Environmental Services Inc., located in Timmins, Ontario for a waste transfer facility.
September 20, 2023 - November 19, 2023 (60 days) Closed
Last updated
An amendment to Environmental Compliance Approval (air & noise) No. 8840-BCENZE has been granted to ASSOCIATED PAVING & MATERIALS LTD., a hot-mix asphalt plant and aggregate processing facility located at 850 Syscon Court, Burlington, Ontario.
This proposal is for the renewal of Permit to Take Water No. 5302-9F5LRR for Santa's Village Inc. Water will be taken from four intakes of Muskoka River, located in the Municipality of Muskoka, Ontario, for recreational purposes.
This proposal is to amend Environmental Compliance Approval (air & noise) No. 9200-A4JPT4 issued to ARCELORMITTAL CANADA INC. and ARCELORMITTAL CANADA MP INC. ARCELORMITTAL CANADA PM INC. as general partners for and on behalf of ARCELORMITTAL DOFASCO G.P./ARCELORMITTAL DOFASCO S.E.N.C., for a manufacturing facility located in Windsor, Ontario.
October 27, 2023 - December 11, 2023 (45 days) Closed
Last updated
An Environmental Compliance Approval has been issued to Harbour Environmental Group (NW Calgary) Ltd., for a facility located on Ottawa, Ontario. The facility undertakes liquid soil processing.
November 18, 2024 - December 18, 2024 (30 days) Closed
Last updated
The Permit to Take Water No. P-300-7188395571 (version 2.0) was issued to R. W. TOMLINSON LIMITED on March 31, 2025, for renewal of P-300-7188395571 (version 1.0). Water will be taken from one pond for aggregate washing, dewatering, and dust suppression purposes, located in the City of Ottawa, Ontario for one year.
Approval is granted for a new Environmental Compliance Approval for stormwater management works servicing a new Trailcon Leasing facility, located at Campbell Street in Cornwall, Ontario.