September 16, 2022 - October 31, 2022 (45 days) Closed
Last updated
A new Environmental Compliance Approval (sewage) is granted for the establishment of a sewage holding tank to service a residential cottage, located at 1009 10th Street, Belwood Lake, in the Township of Centre Wellington, County of Wellington, Ontario.
September 23, 2022 - October 23, 2022 (30 days) Closed
Last updated
This decision is to amend Permit to Take Water No. 6834-BVBRSJ issued to Pure Gold Mine Inc. to increase the maximum daily water taking from the Process Water Pond for mining operations, located in Madsen, Ontario.
September 29, 2022 - November 13, 2022 (45 days) Closed
Last updated
An Environmental Compliance Approval with Limited Operational Flexibility (air) was granted for Char Biocarbon Inc., a facility producing renewable natural gas and biochar from clean woodwaste, locate in the City of Thorold, Ontario.
September 23, 2022 - November 7, 2022 (45 days) Closed
Last updated
An Environmental Compliance Approval for 140 Old Mill Road Limited Partnership by its sole general partner. 140 Old Mill Road GP Inc. and 140 Old Mill Road COINVEST limited partnership by its sole general partner, 140 Old Mill Road COINVEST GP Inc., located in the City of Cambridge.
Instrument type:
Changes to the conditions of a licence to operate a pit or quarry
ERO number
013-3153
Notice type
Instrument
Notice stage
Decision
Decision posted
Proposal posted
Comment period
August 14, 2018 - September 13, 2018 (30 days) Closed
Last updated
Approval was granted for a licence amendment to allow 2223117 Ontario Inc. to change the allowable maximum annual tonnage that can be removed from the site, operating in the Town of the Blue Mountains.
We are seeking input and additional scientific information, including Indigenous knowledge and community knowledge, from the public and Indigenous communities on draft recovery strategies for four species at risk in Ontario. The information we receive will be considered in finalizing the recovery strategies for these species at risk.
January 28, 2022 - March 14, 2022 (45 days) Closed
Last updated
An amended Environmental Compliance Approval for Organic Waste Management Inc., a waste processing facility located in the Township of Perth East, Ontario.
An amendment to Environmental Compliance Approval No. 3-0146-95-006 was issued for Econo-Malls Holdings #25 Inc., to include proposed changes to existing stormwater management works servicing a Walmart facility, located at 274 Millennium Parkway in the City of Belleville, Ontario.
William Day Construction Limited requested to withdraw their application for an Environmental Compliance Approval (air). The application is considered withdrawn and no approval was issued.
Instrument type:
Changes to the site plan for a pit or quarry
ERO number
013-3151
Notice type
Instrument
Notice stage
Decision
Decision posted
Proposal posted
Comment period
August 14, 2018 - September 13, 2018 (30 days) Closed
Last updated
Approval was granted for a site plan amendment to allow 2223117 Ontario Inc. to integrate operations between the existing Aggregate Resources Act (ARA) licence No. 4945 and the approved expansion ARA Licence No. 625996, operating in the Town of the Blue Mountains.
Instrument type:
Minister's directions to ministry employees and agents to rehabilitate a mine hazard in an emergency
ERO number
019-6655
Notice type
Instrument
Notice stage
Exception
Exception posted
Last updated
Minister's Directions were issued under section 148 (3) (4) (5) of the Mining Act in 2019 and 2020, to employees and agents of the Ministry of Mines to prevent access to mine hazards by installing a fence and backfilling openings. The rehabilitation measures were completed on November 2, 2020.
A new Environmental Compliance Approval was granted to PDCP Block 8 & 10 Industrial GP Inc., as a general partner for and on behalf of PDCP Block 8 & 10 Industrial Limited Partnership, for industrial stormwater management works serving a proposed industrial development, located at 160 Bullock Street in the City of Kitchener.