August 8, 2025 - September 22, 2025 (45 days) Closed
Last updated
We want to hear from municipalities, Indigenous communities, and others how to best support rural, northern, and Indigenous communities with access to natural gas for development. Our goal is to enable affordable heating and energy options for communities to foster economic growth.
This proposal is for an Environmental Compliance Approval with Limited Operational Flexibility (air) from Molten Metallurgy Inc., a steel and iron castings manufacturing facility located in Paris, Ontario.
February 20, 2024 - April 5, 2024 (45 days) Closed
Last updated
This proposal is for a new Environmental Compliance Approval (air & noise) for TRIPLE M METAL CORP. as general partner for and on behalf of TRIPLE M METAL LP, for the operation of a mobile metal recycling and processing facility equipped with one screener.
This proposal is for a new Environmental Compliance Approval with Limited Operational Flexibility (air) for SPRUCEDALE AGROMART LIMITED, a manufacturing facility, located at 24 Sideroad 25 North, Walkerton, Ontario.
This proposal is for an Environmental Compliance Approval with Limited Operational Flexibility (Air) for Mill-Am Corporation for the operation of a hot-mix asphalt plant and aggregate depot, located at 5151 Rhodes Drive in the City of Windsor, Ontario.
August 8, 2025 - September 7, 2025 (30 days) Closed
Last updated
This proposal is for the renewal of Permit to Take Water No. 4785-AYCKSB for water supply and industrial-manufacturing purposes. Water will be taken from one well and one watercourse in Pembroke, Ontario.
Certificate of Property Use No. 6745-DFPFM8 for 109 George Street, Toronto, Ontario, was issued to owners as part of their development plans for the site.
Old Hamburg Village Inc. requested to withdraw their application for a Permit to Take Water (PTTW) for dewatering and foundation drainage purposes. The application is considered withdrawn and no PTTW was issued.
September 6, 2024 - October 21, 2024 (45 days) Closed
Last updated
We issued an amended Environmental Compliance Approval (air & noise) with Operational Flexibility to fischer Canada Stainless Tubing Inc., a tube manufacturing and shaping facility located in the City of Waterloo, Ontario.
September 7, 2022 - October 22, 2022 (45 days) Closed
Last updated
This proposal is for an Environmental Compliance Approval with Limited Operational Flexibility (air) for Meridian Lightweight Technologies Inc., a magnesium auto parts manufacturing facility located in the Township of Strathroy-Cardoc, Ontario.
This proposal is for a new Environmental Compliance Approval (Air & Noise) for Cole's Metal Fabricating Ltd., a metal fabrication facility, located in the City of Windsor, Ontario.
September 29, 2021 - November 13, 2021 (45 days) Closed
Last updated
The Ministry of Transportation has decided not to proceed with the proposed amendments to Ontario Regulation 306/15 (Pilot Project – Automated Vehicles) and related amendments to Regulation 628 (Vehicle Permits).
October 25, 2022 - December 9, 2022 (45 days) Closed
Last updated
The province is proposing new legislation that, if passed, would require the expansion of crucial wastewater treatment services for York Region and the construction of a phosphorus reduction facility to remove phosphorus from drainage water that flows into Lake Simcoe. The ministry is seeking comments on the proposed legislation.
December 1, 2021 - January 15, 2022 (45 days) Closed
Last updated
We are replacing the Noise Pollution Control Publication 206 (NPC-206) guideline with the Noise Pollution Control Publication 306 (NPC-306), so we can provide updated guidance on the methods and software for determining the impacts of noise due to road and rail projects.
Instrument type:
Order to prevent discharge of contaminants
ERO number
019-8375
Notice type
Instrument
Notice stage
ProposalUpdated
Proposal posted
Comment period
March 14, 2024 - April 28, 2024 (45 days) Closed
Last updated
The Director is proposing to issue a Director’s order under section 18 of the Environmental Protection Act to address hazards associated with 62 natural gas wells licensed to Glenfred Gas Wells Ltd., in the Country of Haldimand.
January 5, 2024 - February 4, 2024 (30 days) Closed
Last updated
This proposal is for a renewal to Permit to Take Water No. 2815-C25LY2 for Kirkland Lake Gold Ltd. Water will be taken from one well for plant site dewatering purposes, located 185 km northeast from Cochrane via Highway 652 in Unsurveyed Territory in the District of Cochrane, Ontario.
November 22, 2023 - December 22, 2023 (30 days) Closed
Last updated
This proposal is for the renewal of Permit to Take Water No. 7255-CLXMT8 for Great Bear Resources Ltd. Water will be taken from eight wells, four watercourses, and five lakes for industrial purposes, located south of Red Lake, Ontario.
This proposal is for a new Permit to Take Water for Prodigy Gold Inc. Water will be taken for dewatering and industrial purposes as part of the Magino Mine project, located in the Township of Dubreuilville, Ontario.