October 8, 2024 - November 22, 2024 (45 days) Closed
Last updated
A decision was made to proceed with implementing enhancements to the points-based moose tag allocation process. These changes will encourage hunters to only apply for the tags they intend to claim and make available certain unclaimed and unawarded tags.
The Director of Exploration has made a decision on the exploration permit application PR-25-000080 to VAL-D'OR MINING CORPORATION for early exploration activities.
The decision is to issue the mineral exploration permit.
The Director of Exploration has made a decision on the exploration permit application PR-25-000079 to Kirkland Lake Discoveries Corp. for early exploration activities.
The decision is to issue the mineral exploration permit.
This proposal is for the renewal of the Limited Operational Flexibility for an Environmental Compliance Approval (air & noise) No. 2804-9X5PHD for Soprema Inc., a roofing panel fabrication facility located in the County of Brant, Ontario.
This application is for an amendment to renew the Environmental Compliance Approval (ECA) No. 3873-ABUHAX for sewage treatment and subsurface disposal systems to service the re-development of a seasonal resort - Camping Resort, Lot 9, 10, Concession 1, Township of Leeds & 1000 Islands.
This proposal is for a New Environmental Compliance Approval (air & noise) for Centennial Material Handling Limited, a manufacturing facility for storage racks and shelves for industrial and commercial purposes, located in the City of Vaughan, Ontario.
This proposal is for a new Environmental Compliance Approval (air & noise) for REMEA CANADA INC. for the operation of a mobile waste processing facility throughout the Province of Ontario.
November 7, 2023 - December 22, 2023 (45 days) Closed
Last updated
The ministry has issued a new Environmental Compliance Approval for the establishment of subsurface sewage disposal works rated at 37,700 litres per day, to service a campground located at 108 Miller Lake Shore Road, in the Town of Northern Bruce Peninsula.
Amended Environmental Compliance Approval was issued with conditions. This amendment was to approve the removal of pond C sludge to decommission pond C.
November 8, 2024 - December 23, 2024 (45 days) Closed
Last updated
The ministry has issued a new Environmental Compliance Approval (sewage) to Hydro Ottawa Limited to construct new spill containment systems to service a proposed Municipal Hydro Transformer Substation located at 5134 Piperville Road, in the City of Ottawa, Ontario.
August 18, 2023 - October 2, 2023 (45 days) Closed
Last updated
Establishment of an industrial stormwater management Works to serve Great Lakes Port Management Inc. (GLPM), trucking/trailer site, located in the City of Thorold, for the collection, transmission, treatment and disposal of stormwater run-off from a total catchment area of approximately 5.0 hectares, to provide normal level water quality.
The ministry has issued a new Environmental Compliance Approval (sewage) to Toronto Hydro-Electric System Limited for the installation of an oil containment system as part of transformer replacement work serving electrical utility distribution stations, located at 62 Elmhurst Drive, in the City of Toronto, Ontario.
Instrument type:
Approval of an amendment to the Niagara Escarpment Plan
ERO number
019-5928
Notice type
Instrument
Notice stage
Decision
Decision posted
Proposal posted
Comment period
September 1, 2022 - October 31, 2022 (60 days) Closed
Last updated
A decision was made to approve an amendment to the Niagara Escarpment Plan to re-designate 30.5 ha of land from Escarpment Rural Area to Mineral Resource Extraction Area to facilitate an expansion to the existing Dufferin Milton quarry and to approve site specific policy amendments to support the expansion.
October 18, 2023 - December 2, 2023 (45 days) Closed
Last updated
We have approved a new Environmental Compliance Approval No. 2936-DHGLJZ for York1 Tiffin Recycling Ltd. for the construction and operation of a waste disposal site (processing) located within a 1.639 hectares total site area located at 529 Tiffin Street in the City of Barrie.
This proposal is to amend the existing Environmental Compliance Approval No. 1547-CB2RL4 to add the operational flexibility (LOF) option to allow small future process changes that do not impact the effluent quality or quantity. Stelco is also proposing to replace the existing vacuum drum filter with a belt filter press.
This proposal is for an Environmental Compliance Approval with Limited Operational Flexibility (air & noise) for Miller Waste Systems Inc., a non-hazardous municipal waste collection and handling facility, located in the City of Brampton, Ontario.
This proposal is for the renewal of the Limited Operational Flexibility for Environmental Compliance Approval (air & noise) No. 5095-9VDNQL for Sulco Chemicals Limited, a facility manufacturing sulphur based chemical products and packages various chemicals, located in the community of Elmira in the Township of Woolwich, Ontario.
This proposal is for a new Environmental Compliance Approval (sewage) to install stormwater management works facilities serving TC LAND 2 INC. as general partner for and on behalf of TC Land 2 Partnership and TC Land 2 Partnership through its general partner TC LAND LP by ANNEXPARK LAND GP CORP. as the general partner of TC Land 2 Partnership.
This proposal is for a new Environmental Compliance Approval (sewage) to install stormwater management works facilities for Blackrock Properties Equity Inc. and James Edward Sawyer operating as River Road Estates, for stormwater run-off from the lands located at Lot 9, Concession B, Township of McNab/Braeside, Ontario.