Transition Metals Corporation - Mineral exploration permit

Instrument type: Mineral exploration permit

ERO number
019-1627
Ministry reference number
PR-20-000101
Notice type
Instrument
Act
Mining Act, R.S.O. 1990
Posted by
Ministry of Energy, Northern Development and Mines
Transferred to
Ministry of Mines
Notice stage
Proposal Updated
Proposal posted
Comment period
April 8, 2020 - May 8, 2020 (30 days) Closed
Last updated

There is no requirement to post this notice on the Environmental Registry of Ontario, but we want to hear your thoughts. Submit a comment and tell us what you think. Learn about the consultation process and types of notices on the registry.

Update Announcement

A decision for this proposal has been published as a Bulletin under ERO 019-1859 on June 1, 2020.

This consultation was open from:

April 8, 2020
to May 8, 2020

Proposal summary

The Ministry is proposing to issue a permit to Transition Metals Corporation to undertake these early exploration activities: Mechanized drilling and mechanized stripping.

The exploration activities are located approximately 80 kilometres West by North West from the town of Temiskaming Shores, in Nicol township.

Location details

Site location details

The exploration activities are located approximately 80 kilometres West by North West from the town of Temiskaming Shores, in Nicol township.

Claim numbers instructions: “To view individual claims on a map please use the Mining Lands Administration System. Click on “I want to…” and select “Find a claim” to search by claim numbers or “Find a township” to search by township.”

Claim Numbers: 101545, 105006, 108608, 108609, 204880, 215682, 257396, 334602

Site location map

The location pin reflects the approximate area where environmental activity is taking place.

View this location on a map opens link in a new window

Proponent(s)

Transition Metals Corporation
410 Falconbridge Road
Suite 5
Sudbury, ON
P3A 4S4
Canada

Why consultation isn't required

On April 1, 2020, the Ontario Government made a temporary regulation to respond to the COVID-19 outbreak. Ontario Regulation 115/20 exempts all proposals for policies, acts, regulations and instruments from posting requirements under the EBR until 30 days after the declared emergency is terminated. Notwithstanding the exemption, ENDM posted a proposal for this instrument for consultation, and has taken any responses received as a result of the posting into account.

Proposal details

Transition Metals Corporation has submitted an application to the ministry for an exploration permit as required under the Mining Act for prescribed early exploration activities.

The activities that this permit would allow Transition Metals Corporation to carry out are as follows:

  • mechanized Drilling (greater than 150 kilograms)
  • mechanized Stripping (greater than 100 square metres in a 200 metres radius)

The potential disturbance from the activities are described as:

Mechanized Surface Stripping: uses heavy equipment to remove vegetation and soil (overburden) from bedrock. The potential environmental disturbance includes (but are not limited to): use of heavy equipment such as bulldozers, backhoes, excavators or forest harvest equipment, to remove soil from the bedrock, washing the bedrock by pumping water from nearby lakes, rivers or streams, and creation of access trails.

Drilling: provides rock samples from below the surface. Testing the samples determines the properties of the soil and rocks, including mineral and metal content. Potential environmental disturbances include (but are not limited to): clearing surface terrain for “drill pads” (small areas cleared for drill rigs and/or helicopters), installing casings (hollow steel pipes called the collar), and pumping water from a sump, nearby lakes, rivers or streams.

Provincial standards for early exploration are required to be followed by proponents to minimize the impacts to public health, safety and the environment from early exploration activities described above. You can find the standards in the Activities Information Sheets or on the Ministry website under Mining Act Policies, Standards and Directives.

This notice is provided to receive comments that can be considered in the decision-making process prior to the issuance of an exploration permit.

An Exploration Permit does not relieve the proponent from compliance with any other requirements that are set out under the Mining Act or any other Act. All activities included in the Exploration Permit proposal must be carried out in compliance with Ontario Regulation 308/12 and the Provincial Standards for Early Exploration. The Exploration Permit duration will be up to 3 years with the possibility of one renewal for up to three years.

Supporting materials

View materials in person

Some supporting materials may not be available online. If this is the case, you can request to view the materials in person.

Get in touch with the office listed below to find out if materials are available.

Mineral Development Office (Timmins)
Address

5520 Highway 101 E Highway
PO Box 3060
South Porcupine Ontario, ON
P0N 1H0
Canada

Office phone number

Comment

Commenting is now closed.

The comment period was from April 8, 2020
to May 8, 2020

Connect with us

Contact

Andrew Persad

Phone number
Email address
Office
Mineral Development Office (Northeast), Ontario Government Complex
Address

5520 Highway 101 East
PO Box 3060
South Porcupine, ON
P0N 1H0
Canada

Sign up for notifications

We will send you email notifications with any updates related to this consultation. You can change your notification preferences anytime by visiting settings in your profile page.

Follow this notice