Transition Metals Corporation - Mineral exploration permit

La traduction française de cet avis n'est pas disponible. Nous nous excusons pour le dérangement.

Type d'acte: Mineral exploration permit

Numéro du REO
019-1627
Numéro de référence du ministère
PR-20-000101
Type d'avis
Instrument
Loi
Mining Act, R.S.O. 1990
Affiché par
Ministry of Energy, Northern Development and Mines
Étape de l'avis
Ministry of Mines
Étape de l'avis
Proposition Mis à jour
Proposition affichée
Période de consultation
Du 8 avril 2020 au 8 mai 2020 (30 jours) Fermé
Dernière mise à jour

Il n’existe aucune obligation d’afficher cet avis sur le Registre environnemental de l’Ontario, mais nous voulons connaître votre opinion. Soumettez un commentaire et donnez-nous votre avis. Pour en savoir davantage sur le processus de consultation et les types d’avis publiés sur le registre.

Update Announcement

A decision for this proposal has been published as a Bulletin under ERO 019-1859 on June 1, 2020.

Cette consultation a eu lieu :

du 8 avril 2020
au 8 mai 2020

Résumé de la proposition

The Ministry is proposing to issue a permit to Transition Metals Corporation to undertake these early exploration activities: Mechanized drilling and mechanized stripping.

The exploration activities are located approximately 80 kilometres West by North West from the town of Temiskaming Shores, in Nicol township.

Détails de l'emplacement

Détails de l'emplacement du site

The exploration activities are located approximately 80 kilometres West by North West from the town of Temiskaming Shores, in Nicol township.

Claim numbers instructions: “To view individual claims on a map please use the Mining Lands Administration System. Click on “I want to…” and select “Find a claim” to search by claim numbers or “Find a township” to search by township.”

Claim Numbers: 101545, 105006, 108608, 108609, 204880, 215682, 257396, 334602

Carte de l'emplacement du site

L'épingle de localisation correspond à la zone approximative où a lieu l’activité environnementale.

Afficher cet emplacement sur une carte opens link in a new window

Promoteur(s)

Transition Metals Corporation
410 Falconbridge Road
Suite 5
Sudbury, ON
P3A 4S4
Canada

Pourquoi une consultation n’est pas nécessaire

On April 1, 2020, the Ontario Government made a temporary regulation to respond to the COVID-19 outbreak. Ontario Regulation 115/20 exempts all proposals for policies, acts, regulations and instruments from posting requirements under the EBR until 30 days after the declared emergency is terminated. Notwithstanding the exemption, ENDM posted a proposal for this instrument for consultation, and has taken any responses received as a result of the posting into account.

Détails de la proposition

Transition Metals Corporation has submitted an application to the ministry for an exploration permit as required under the Mining Act for prescribed early exploration activities.

The activities that this permit would allow Transition Metals Corporation to carry out are as follows:

  • mechanized Drilling (greater than 150 kilograms)
  • mechanized Stripping (greater than 100 square metres in a 200 metres radius)

The potential disturbance from the activities are described as:

Mechanized Surface Stripping: uses heavy equipment to remove vegetation and soil (overburden) from bedrock. The potential environmental disturbance includes (but are not limited to): use of heavy equipment such as bulldozers, backhoes, excavators or forest harvest equipment, to remove soil from the bedrock, washing the bedrock by pumping water from nearby lakes, rivers or streams, and creation of access trails.

Drilling: provides rock samples from below the surface. Testing the samples determines the properties of the soil and rocks, including mineral and metal content. Potential environmental disturbances include (but are not limited to): clearing surface terrain for “drill pads” (small areas cleared for drill rigs and/or helicopters), installing casings (hollow steel pipes called the collar), and pumping water from a sump, nearby lakes, rivers or streams.

Provincial standards for early exploration are required to be followed by proponents to minimize the impacts to public health, safety and the environment from early exploration activities described above. You can find the standards in the Activities Information Sheets or on the Ministry website under Mining Act Policies, Standards and Directives.

This notice is provided to receive comments that can be considered in the decision-making process prior to the issuance of an exploration permit.

An Exploration Permit does not relieve the proponent from compliance with any other requirements that are set out under the Mining Act or any other Act. All activities included in the Exploration Permit proposal must be carried out in compliance with Ontario Regulation 308/12 and the Provincial Standards for Early Exploration. The Exploration Permit duration will be up to 3 years with the possibility of one renewal for up to three years.

Documents justificatifs

Consulter les documents en personne

Certains documents justificatifs peuvent ne pas être accessibles en ligne. Si tel est le cas, vous pouvez demander à consulter les documents en personne.

Veuillez communiquer avec le bureau mentionné ci-dessous pour savoir si les documents sont accessibles.

Mineral Development Office (Timmins)
Address

5520 Highway 101 E Highway
PO Box 3060
South Porcupine Ontario, ON
P0N 1H0
Canada

Office phone number

Commentaire

La consultation est maintenant terminée.

La période de consultation a eu lieu du 8 avril 2020
au 8 mai 2020

Communiquer avec nous

Contact

Andrew Persad

Phone number
Email address
Office
Mineral Development Office (Northeast), Ontario Government Complex
Address

5520 Highway 101 East
PO Box 3060
South Porcupine, ON
P0N 1H0
Canada

S'inscrire pour obtenir des avis

Nous vous enverrons des avis par courriel accompagnés de toute mise à jour liée à cette consultation. Vous pouvez modifier vos préférences relatives à l'avis en tout temps en allant à votre page de profil où se trouvent vos paramètres.

Suivre cet avis