R. W. Tomlinson Limited - Environmental Compliance Approval (air)

Instrument type: Environmental Compliance Approval (air)

ERO number
019-1663
Ministry reference number
9183-BMTH2Z
Notice type
Instrument
Act
Environmental Protection Act, R.S.O. 1990
Posted by
Ministry of the Environment, Conservation and Parks
Notice stage
Proposal Updated
Proposal posted
Comment period
April 20, 2020 - June 4, 2020 (45 days) Closed
Last updated

There is no requirement to post this notice on the Environmental Registry of Ontario, but we want to hear your thoughts. Submit a comment and tell us what you think. Learn about the consultation process and types of notices on the registry.

Update Announcement

A decision for this proposal has been published as a Bulletin under ERO 019-2484 on October 7, 2020.

This consultation was open from:

April 20, 2020
to June 4, 2020

Proposal summary

This proposal is for an Environmental Compliance Approval (ECA) with Limited Operational Flexibility (Air), which replaces all current ECAs for Air at this facility, including new, or historically unapproved, sources of emissions from the R. W. Tomlinson Limited.

Location details

Site address

Bruce Mines Town, ON
P0R 1C0
Canada

Site location details

Lot 4, Concession 3

Site location map

The location pin reflects the approximate area where environmental activity is taking place.

View this location on a map opens link in a new window

Proponent(s)

R. W. Tomlinson Limited
100 Citigate Drive
Ottawa, ON
K2J 6K7
Canada

Why consultation isn't required

On April 1, 2020, the Ontario Government made a temporary regulation to respond to the COVID-19 outbreak. Ontario Regulation 115/20 exempts all proposals for policies, acts, regulations and instruments from posting requirements under the EBR until 30 days after the declared emergency is terminated

Proposal details

This proposal is for an Environmental Compliance Approval with Limited Operational Flexibility (Air), which replaces all the current Environmental Compliance Approvals for Air at this facility, and includes the addition of new, or historically unapproved, sources for all emissions from R. W. Tomlinson Limited, a facility used for quarrying and processing of aggregate materials located in the Town of Bruce Mines, Ontario.

The application includes all sources at the facility, including primary, secondary and tertiary crushing and screening equipment.

Emissions to the air from this facility include suspended particulate matter and crystalline silica.

The Environmental Compliance Approval with Limited Operational Flexibility (Air), when issued, permits modifications to the facility subject to limits on operational flexibility that include a production limit for the facility to be specified on the Environmental Compliance Approval with Limited Operational Flexibility (Air).

The limited operational flexibility conditions have an expiry date. The company will be required to make an application for amendment at that time to renew these conditions.

Supporting materials

View materials in person

Some supporting materials may not be available online. If this is the case, you can request to view the materials in person.

Get in touch with the office listed below to find out if materials are available.

Comment

Commenting is now closed.

The comment period was from April 20, 2020
to June 4, 2020

Connect with us

Contact

Sign up for notifications

We will send you email notifications with any updates related to this consultation. You can change your notification preferences anytime by visiting settings in your profile page.

Follow this notice