R. W. Tomlinson Limited - Environmental Compliance Approval (air)

La traduction française de cet avis n'est pas disponible. Nous nous excusons pour le dérangement.

Type d'acte: Environmental Compliance Approval (air)

Numéro du REO
019-1663
Numéro de référence du ministère
9183-BMTH2Z
Type d'avis
Instrument
Loi
Environmental Protection Act, R.S.O. 1990
Affiché par
Ministry of the Environment, Conservation and Parks
Étape de l'avis
Proposition Mis à jour
Proposition affichée
Période de consultation
Du 20 avril 2020 au 4 juin 2020 (45 jours) Fermé
Dernière mise à jour

Il n’existe aucune obligation d’afficher cet avis sur le Registre environnemental de l’Ontario, mais nous voulons connaître votre opinion. Soumettez un commentaire et donnez-nous votre avis. Pour en savoir davantage sur le processus de consultation et les types d’avis publiés sur le registre.

Update Announcement

A decision for this proposal has been published as a Bulletin under ERO 019-2484 on October 7, 2020.

Cette consultation a eu lieu :

du 20 avril 2020
au 4 juin 2020

Résumé de la proposition

This proposal is for an Environmental Compliance Approval (ECA) with Limited Operational Flexibility (Air), which replaces all current ECAs for Air at this facility, including new, or historically unapproved, sources of emissions from the R. W. Tomlinson Limited.

Détails de l'emplacement

Adresse du site

Bruce Mines Town, ON
P0R 1C0
Canada

Détails de l'emplacement du site

Lot 4, Concession 3

Carte de l'emplacement du site

L'épingle de localisation correspond à la zone approximative où a lieu l’activité environnementale.

Afficher cet emplacement sur une carte opens link in a new window

Promoteur(s)

R. W. Tomlinson Limited
100 Citigate Drive
Ottawa, ON
K2J 6K7
Canada

Pourquoi une consultation n’est pas nécessaire

On April 1, 2020, the Ontario Government made a temporary regulation to respond to the COVID-19 outbreak. Ontario Regulation 115/20 exempts all proposals for policies, acts, regulations and instruments from posting requirements under the EBR until 30 days after the declared emergency is terminated

Détails de la proposition

This proposal is for an Environmental Compliance Approval with Limited Operational Flexibility (Air), which replaces all the current Environmental Compliance Approvals for Air at this facility, and includes the addition of new, or historically unapproved, sources for all emissions from R. W. Tomlinson Limited, a facility used for quarrying and processing of aggregate materials located in the Town of Bruce Mines, Ontario.

The application includes all sources at the facility, including primary, secondary and tertiary crushing and screening equipment.

Emissions to the air from this facility include suspended particulate matter and crystalline silica.

The Environmental Compliance Approval with Limited Operational Flexibility (Air), when issued, permits modifications to the facility subject to limits on operational flexibility that include a production limit for the facility to be specified on the Environmental Compliance Approval with Limited Operational Flexibility (Air).

The limited operational flexibility conditions have an expiry date. The company will be required to make an application for amendment at that time to renew these conditions.

Documents justificatifs

Consulter les documents en personne

Certains documents justificatifs peuvent ne pas être accessibles en ligne. Si tel est le cas, vous pouvez demander à consulter les documents en personne.

Veuillez communiquer avec le bureau mentionné ci-dessous pour savoir si les documents sont accessibles.

Commentaire

La consultation est maintenant terminée.

La période de consultation a eu lieu du 20 avril 2020
au 4 juin 2020

Communiquer avec nous

Contact

S'inscrire pour obtenir des avis

Nous vous enverrons des avis par courriel accompagnés de toute mise à jour liée à cette consultation. Vous pouvez modifier vos préférences relatives à l'avis en tout temps en allant à votre page de profil où se trouvent vos paramètres.

Suivre cet avis