Il n’existe aucune obligation d’afficher cet avis sur le Registre environnemental de l’Ontario, mais nous voulons connaître votre opinion. Soumettez un commentaire et donnez-nous votre avis. Pour en savoir davantage sur le processus de consultation et les types d’avis publiés sur le registre.
Update Announcement
A decision for this proposal has been published as a Bulletin under ERO 019-2484 on October 7, 2020.
Cette consultation a eu lieu :
du 20 avril 2020
au 4 juin 2020
Résumé de la proposition
This proposal is for an Environmental Compliance Approval (ECA) with Limited Operational Flexibility (Air), which replaces all current ECAs for Air at this facility, including new, or historically unapproved, sources of emissions from the R. W. Tomlinson Limited.
Détails de l'emplacement
Adresse du site
Bruce Mines Town,
ON
P0R 1C0
Canada
Détails de l'emplacement du site
Lot 4, Concession 3
Carte de l'emplacement du site
L'épingle de localisation correspond à la zone approximative où a lieu l’activité environnementale.
Afficher cet emplacement sur une carte opens link in a new windowPromoteur(s)
R. W. Tomlinson Limited
100 Citigate Drive
Ottawa,
ON
K2J 6K7
Canada
Pourquoi une consultation n’est pas nécessaire
On April 1, 2020, the Ontario Government made a temporary regulation to respond to the COVID-19 outbreak. Ontario Regulation 115/20 exempts all proposals for policies, acts, regulations and instruments from posting requirements under the EBR until 30 days after the declared emergency is terminated
Détails de la proposition
This proposal is for an Environmental Compliance Approval with Limited Operational Flexibility (Air), which replaces all the current Environmental Compliance Approvals for Air at this facility, and includes the addition of new, or historically unapproved, sources for all emissions from R. W. Tomlinson Limited, a facility used for quarrying and processing of aggregate materials located in the Town of Bruce Mines, Ontario.
The application includes all sources at the facility, including primary, secondary and tertiary crushing and screening equipment.
Emissions to the air from this facility include suspended particulate matter and crystalline silica.
The Environmental Compliance Approval with Limited Operational Flexibility (Air), when issued, permits modifications to the facility subject to limits on operational flexibility that include a production limit for the facility to be specified on the Environmental Compliance Approval with Limited Operational Flexibility (Air).
The limited operational flexibility conditions have an expiry date. The company will be required to make an application for amendment at that time to renew these conditions.
Documents justificatifs
Consulter les documents en personne
Certains documents justificatifs peuvent ne pas être accessibles en ligne. Si tel est le cas, vous pouvez demander à consulter les documents en personne.
Veuillez communiquer avec le bureau mentionné ci-dessous pour savoir si les documents sont accessibles.
Communiquer avec nous
Contact
Client Services and Permissions Branch
135 St Clair Ave West
1st Floor
Toronto,
ON
M4V 1P5
Canada
Commentaire
La consultation est maintenant terminée.
La période de consultation a eu lieu du 20 avril 2020
au 4 juin 2020