Gerdau Ameristeel Corporation - Environmental Compliance Approval (sewage)

Instrument type: Environmental Compliance Approval (sewage)

ERO number
019-2313
Ministry reference number
3998-BMKMVF
Notice type
Instrument
Act
Environmental Protection Act, R.S.O. 1990
Posted by
Ministry of the Environment, Conservation and Parks
Notice stage
Decision
Decision posted
Comment period
August 27, 2020 - October 11, 2020 (45 days) Closed
Last updated

This consultation was open from:
August 27, 2020
to October 11, 2020

Decision summary

We have cancelled this Environmental Compliance Approval application for industrial stormwater management facility and storm sewer works serving Gerdau Ameristeel Corporation, located at 53 Fair Road in the City of Guelph, Ontario, for the collection, transmission, treatment and disposal of onsite stormwater runoff.

Location details

Site address

53 Fair Road
Guelph, ON
N1K 1T3
Canada

Site location map

The location pin reflects the approximate area where environmental activity is taking place.

View this location on a map opens link in a new window

Proponent(s)

Gerdau Ameristeel Corporation
1 Gerdau Court
Whitby, ON
L1N 5T1
Canada

Decision details

This Environmental Compliance Approval application has been withdrawn by the proponent on December 07, 2020. The application was cancelled on December 11, 2020.

Comments received

Through the registry

0

By email

0

By mail

0
View comments submitted through the registry

Effects of consultation

No comments were received. Application was withdrawn by the proponent.

Supporting materials

View materials in person

Some supporting materials may not be available online. If this is the case, you can request to view the materials in person.

Get in touch with the office listed below to find out if materials are available.

How to Appeal

Appeals are not allowed

Application was withdrawn by the Proponent.

Connect with us

Contact

Sign up for notifications

We will send you email notifications with any updates related to this consultation. You can change your notification preferences anytime by visiting settings in your profile page.

Follow this notice

Original proposal

ERO number
019-2313
Ministry reference number
3998-BMKMVF
Notice type
Instrument
Act
Environmental Protection Act, R.S.O. 1990
Posted by
Ministry of the Environment, Conservation and Parks
Proposal posted

Comment period

August 27, 2020 - October 11, 2020 (45 days)

Proposal details

The proposal is for a new Environmental Compliance Approval for industrial stormwater management facility and storm sewer works serving Gerdau Ameristeel Corporation located at the municipal address of 53 Fair Road in the City of Guelph for the collection, transmission, treatment and disposal of onsite stormwater runoff from a total catchment area of 1.49 hectares, to provide Enhanced Level water quality protection and erosion control, and to attenuate post-development peak flows to allowable peak flows for all storm up to a 5-year design storm event, consisting of the following:

  • one (1) proposed oil and grit separator to treat runoff from a catchment area of 1.49 hectares: Stormceptor EFO8 unit or equivalent unit located at the southwest corner of the subject property providing an enhanced level of protection, having a sediment storage capacity of 1.190 cubic metres, and oil storage capacity of 545 litres, a total storage volume of approximately 1.735 cubic metres, and a estimated water quality flow rate of 51.13 litres per second, receiving inflow from the proposed storm sewer on the subject property
  • one (1) stormwater management facility providing quantity control for a catchment area 1.35 hectares consisting of 36.2 metre of 525 millimeter diameter pipe storage from CBMH.2 to CBMH.3 and parking lot storage with a total depth of 0.20 metre located at the new catchbasins (CB.1, CBMH.2 and CBMH.3) with a 525 millimetre diameter storm outlet pipe equipped with a 350 millimetre diameter orifice located within DICB.3 allowing a maximum discharge of 0.287 cubic metres per second under the 5-year design storm event providing a total storage volume of 71.5 cubic metres
  • proposed storm sewers on the subject property ranging from 200 mm to 525 mm diameter discharging to the existing municipal ditch located on Fair Road
  • including erosion/sedimentation control measures during construction and all other controls and appurtenances essential for the proper operation of the aforementioned works

Supporting materials

View materials in person

Some supporting materials may not be available online. If this is the case, you can request to view the materials in person.

Get in touch with the office listed below to find out if materials are available.

Comment

Commenting is now closed.

This consultation was open from August 27, 2020
to October 11, 2020

Connect with us

Contact