Gerdau Ameristeel Corporation - Environmental Compliance Approval (sewage)

La traduction française de cet avis n'est pas disponible. Nous nous excusons pour le dérangement.

Type d'acte: Environmental Compliance Approval (sewage)

Numéro du REO
019-2313
Numéro de référence du ministère
3998-BMKMVF
Type d'avis
Instrument
Loi
Environmental Protection Act, R.S.O. 1990
Affiché par
Ministry of the Environment, Conservation and Parks
Étape de l'avis
Décision
Décision publiée
Période de consultation
Du 27 août 2020 au 11 octobre 2020 (45 jours) Fermé
Dernière mise à jour

Cette consultation a eu lieu :

du 27 août 2020
au 11 octobre 2020

Résumé de la décision

We have cancelled this Environmental Compliance Approval application for industrial stormwater management facility and storm sewer works serving Gerdau Ameristeel Corporation, located at 53 Fair Road in the City of Guelph, Ontario, for the collection, transmission, treatment and disposal of onsite stormwater runoff.

Détails de l'emplacement

Adresse du site

53 Fair Road
Guelph, ON
N1K 1T3
Canada

Carte de l'emplacement du site

L'épingle de localisation correspond à la zone approximative où a lieu l’activité environnementale.

Afficher cet emplacement sur une carte opens link in a new window

Promoteur(s)

Gerdau Ameristeel Corporation
1 Gerdau Court
Whitby, ON
L1N 5T1
Canada

Détails de la décision

This Environmental Compliance Approval application has been withdrawn by the proponent on December 07, 2020. The application was cancelled on December 11, 2020.

Commentaires reçus

Par l'entremise du registre

0

Par courriel

0

Par la poste

0
Consulter les commentaires soumis par l'entremise du registre

Effets de la consultation

No comments were received. Application was withdrawn by the proponent.

Documents justificatifs

Consulter les documents en personne

Certains documents justificatifs peuvent ne pas être accessibles en ligne. Si tel est le cas, vous pouvez demander à consulter les documents en personne.

Veuillez communiquer avec le bureau mentionné ci-dessous pour savoir si les documents sont accessibles.

How to Appeal

Appeals are not allowed

Application was withdrawn by the Proponent.

Communiquer avec nous

Contact

S'inscrire pour obtenir des avis

Nous vous enverrons des avis par courriel accompagnés de toute mise à jour liée à cette consultation. Vous pouvez modifier vos préférences relatives à l'avis en tout temps en allant à votre page de profil où se trouvent vos paramètres.

Suivre cet avis

Proposition initiale

Numéro du REO
019-2313
Numéro de référence du ministère
3998-BMKMVF
Type d'avis
Instrument
Loi
Environmental Protection Act, R.S.O. 1990
Affiché par
Ministry of the Environment, Conservation and Parks
Proposition affichée

Période de consultation

27 août 2020 - 11 octobre 2020 (45 days)

Détails de la proposition

The proposal is for a new Environmental Compliance Approval for industrial stormwater management facility and storm sewer works serving Gerdau Ameristeel Corporation located at the municipal address of 53 Fair Road in the City of Guelph for the collection, transmission, treatment and disposal of onsite stormwater runoff from a total catchment area of 1.49 hectares, to provide Enhanced Level water quality protection and erosion control, and to attenuate post-development peak flows to allowable peak flows for all storm up to a 5-year design storm event, consisting of the following:

  • one (1) proposed oil and grit separator to treat runoff from a catchment area of 1.49 hectares: Stormceptor EFO8 unit or equivalent unit located at the southwest corner of the subject property providing an enhanced level of protection, having a sediment storage capacity of 1.190 cubic metres, and oil storage capacity of 545 litres, a total storage volume of approximately 1.735 cubic metres, and a estimated water quality flow rate of 51.13 litres per second, receiving inflow from the proposed storm sewer on the subject property
  • one (1) stormwater management facility providing quantity control for a catchment area 1.35 hectares consisting of 36.2 metre of 525 millimeter diameter pipe storage from CBMH.2 to CBMH.3 and parking lot storage with a total depth of 0.20 metre located at the new catchbasins (CB.1, CBMH.2 and CBMH.3) with a 525 millimetre diameter storm outlet pipe equipped with a 350 millimetre diameter orifice located within DICB.3 allowing a maximum discharge of 0.287 cubic metres per second under the 5-year design storm event providing a total storage volume of 71.5 cubic metres
  • proposed storm sewers on the subject property ranging from 200 mm to 525 mm diameter discharging to the existing municipal ditch located on Fair Road
  • including erosion/sedimentation control measures during construction and all other controls and appurtenances essential for the proper operation of the aforementioned works

Documents justificatifs

Consulter les documents en personne

Certains documents justificatifs peuvent ne pas être accessibles en ligne. Si tel est le cas, vous pouvez demander à consulter les documents en personne.

Veuillez communiquer avec le bureau mentionné ci-dessous pour savoir si les documents sont accessibles.

Commentaire

La consultation est maintenant terminée.

Cette consultation a eu lieu 27 août 2020
au 11 octobre 2020

Communiquer avec nous

Contact