Gowest Gold Limited - Acknowledging receipt of a closure plan for a mine production project

Instrument type: Acknowledging receipt of a closure plan for a mine production project

ERO number
019-2440
Ministry reference number
B22 Bradshaw Mine
Notice type
Instrument
Act
Mining Act, R.S.O. 1990
Posted by
Ministry of Energy, Northern Development and Mines
Transferred to
Ministry of Mines
Notice stage
Decision
Decision posted
Comment period
September 16, 2020 - October 16, 2020 (30 days) Closed
Last updated

This consultation was open from:
September 16, 2020
to October 16, 2020

Decision summary

The Director of Exploration has made a decision on the Closure Plan for Production – Bradshaw Mine to Gowest Gold Ltd. for the Bradshaw Mine located 42 kilometres north of the City of Timmins, District of Cochrane, North East Region.

The decision is to file the Closure Plan for Production.

Location details

Site location details

The site is located approximately 42 kilometres north of the City of Timmins, District of Cochrane, North East Region.

Lease numbers instructions: “To view individual leases on a map please use the Mining Lands Administration System. Click on “Search by Location” and select “Mining Lease” to search by lease numbers or “Find a township” to search by township.”

Lease numbers: LEA-107280, LEA-107361, LEA-107310, LEA-107311

Site location map

The location pin reflects the approximate area where environmental activity is taking place.

View this location on a map opens link in a new window

Proponent(s)

Gowest Gold Limited
80 Richmond Street West
Suite 1400
Toronto, ON
M5H 2A4
Canada

Decision details

On October 28, 2020 the ministry filed Closure Plan for Production – Bradshaw Mine for the Bradshaw Mine located 42 kilometres north of the City of Timmins, District of Cochrane, North East Region.

These are the major components of the Closure Plan for Production:

  • an extension of the underground drifts in the deposit, resulting in a mining rate of a maximum of 1,500 tonnes per day of ore on average
  • a new fresh air/egress raise and associated ancillary infrastructure (access road, building)
  • continuation of surface and underground exploration drilling
  • new ancillary surface facilities (additional offices, storage facilities, dry facilities as required)
  • expanded existing laydown areas located to the southwest, and to the north of the site
  • an expansion of the septic system
  • additional fuel tanks and propane storage areas
  • additional short run on-site poles and powerlines
  • improvements to the water management structures, including an additional mine water pond and possible cell 2 of Polishing Pond

Comments received

Through the registry

0

By email

0

By mail

0
View comments submitted through the registry

Effects of consultation

No comment was received through the Environmental Registry of Ontario resulting in no impact on the decision to proceed or not with this proposal.

Supporting materials

View materials in person

Some supporting materials may not be available online. If this is the case, you can request to view the materials in person.

Get in touch with the office listed below to find out if materials are available.

Mineral Development Office (Timmins)
Address

5520 Highway 101 E Highway
PO Box 3060
South Porcupine Ontario, ON
P0N 1H0
Canada

Office phone number

How to Appeal

Appeals are not allowed

This instrument type cannot be appealed. Learn more about our consultation process.

Connect with us

Contact

Susan Thorne

Phone number
Email address
Office
Mineral Development Office (Timmins)
Address

5520 Highway 101 E Highway
PO Box 3060
South Porcupine Ontario, ON
P0N 1H0
Canada

Office phone number

Sign up for notifications

We will send you email notifications with any updates related to this consultation. You can change your notification preferences anytime by visiting settings in your profile page.

Follow this notice

Original proposal

ERO number
019-2440
Ministry reference number
B22 Bradshaw Mine
Notice type
Instrument
Act
Mining Act, R.S.O. 1990
Posted by
Ministry of Energy, Northern Development and Mines
Proposal posted

Comment period

September 16, 2020 - October 16, 2020 (30 days)

Proposal details

Gowest Gold Limited has submitted a Closure Plan for filing by ENDM as required under the Mining Act. This Closure Plan proposes rehabilitation measures to be implemented during closure of Gowest Gold Limited's Bradshaw Mine site.

The Bradshaw Mine involves underground mining of a ramp-accessed gold deposit.

During the Production phase, Gowest will continue using the existing Advanced Exploration infrastructure and construct one raise to provide fresh air and secondary egress. The Production phase will be developed for a total of eight years. It is anticipated that it will take approximately six years to develop the ramp and sub-levels, and an additional two year to extract the remaining reserves.

The following are the major components of this Closure Plan as proposed by Gowest Gold Limited:

  • an extension of the underground drifts in the deposit, resulting in a mining rate of a maximum of 1,500 tonnes per day of ore on average
  • a new fresh air/egress raise and associated ancillary infrastructure (access road, building)
  • continuation of surface and underground exploration drilling
  • new ancillary surface facilities (additional offices, storage facilities, dry facilities as required)
  • expanded existing laydown areas located to the southwest, and to the north of the site
  • an expansion of the septic system
  • additional fuel tanks and propane storage areas
  • additional short run on-site poles and powerlines
  • improvements to the water management structures, including an additional mine water pond and possible cell 2 of Polishing Pond

The remainder of the existing infrastructure currently in use at the Bradshaw Mine will remain unchanged. Some waste rock may also be used for surface road construction onsite or off-site along the access road or as backfill.

Stripped overburden has been stockpiled for use in closure rehabilitation activities.

Supporting materials

View materials in person

Some supporting materials may not be available online. If this is the case, you can request to view the materials in person.

Get in touch with the office listed below to find out if materials are available.

Mineral Development Office (Timmins)
Address

5520 Highway 101 E Highway
PO Box 3060
South Porcupine Ontario, ON
P0N 1H0
Canada

Office phone number

Comment

Commenting is now closed.

This consultation was open from September 16, 2020
to October 16, 2020

Connect with us

Contact

Susan Thorne

Phone number
Email address
Office
Mineral Development Office (Timmins)
Address

5520 Highway 101 E Highway
PO Box 3060
South Porcupine Ontario, ON
P0N 1H0
Canada

Office phone number