Update Announcement
This proposal notice was updated on August 30th, 2024 to advise the public that this file is still under active review. The original proposal date and comment period have not been altered.
This consultation was open from:
October 20, 2021
to December 4, 2021
Proposal summary
This proposal is for an amendment to Environmental Compliance Approval (air & noise) No. 9230-8Q8K5P with Limited Operational Flexibility for Gerdau Ameristeel Corporation, an electric arc furnace steel mill and metal recycling facility located in the City of Whitby, Ontario.
Location details
Site address
1 Gerdau Court
Whitby,
ON
Canada
Site location map
The location pin reflects the approximate area where environmental activity is taking place.
View this location on a map opens link in a new windowProponent(s)
Gerdau Ameristeel Corporation
1 Gerdau Court
Whitby,
ON
L1N 5T1
Canada
Proposal details
This proposal is for an amendment to& Environmental Compliance Approval (air & noise) No. 9230-8Q8K5P with Limited Operational Flexibility for Gerdau Ameristeel Corporation, an electric arc furnace steel mill and metal recycling facility located in the City of Whitby, Ontario.
The emission sources from the manufacturing and associated processes that exhaust to the air include:
- an electric arc furnace
- ladle metallurgy
- continuous casting
- a melt shop
- a bar mill
- a structural mill
- a pumphouse
- cooling towers
- furnaces
- shredders
- recycling torching
- dust collectors
- slag handling and staging
- a carbon storage silo
- other equipment and ancillary and support processes and activities
This proposal is to renew the Limited Operational Flexibility and to reflect updates to the equipment at the facility. Emissions to the air from this facility include:
- particulate matter
- sulphur dioxide
- cadmium
- hexavalent chromium
- lead
- manganese oxide
- nickel
- products of combustion such as nitrogen oxides
The Environmental Compliance Approval with Limited Operational Flexibility (air), when issued, permits modifications to the facility subject to limits on operational flexibility that include a production limit for the facility to be specified on the Environmental Compliance Approval with Limited Operational Flexibility (air).
The limited operational flexibility conditions have an expiry date. The company will be required to make an application for amendment at that time to renew these conditions.
Supporting materials
View materials in person
Some supporting materials may not be available online. If this is the case, you can request to view the materials in person.
Get in touch with the office listed below to find out if materials are available.
Connect with us
Contact
Client Services and Permissions Branch