Update Announcement
This proposal notice was updated on August 30th, 2024 to advise the public that this file is still under active review. The original proposal date and comment period have not been altered.
Cette consultation a eu lieu :
du 20 octobre 2021
au 4 décembre 2021
Résumé de la proposition
This proposal is for an amendment to Environmental Compliance Approval (air & noise) No. 9230-8Q8K5P with Limited Operational Flexibility for Gerdau Ameristeel Corporation, an electric arc furnace steel mill and metal recycling facility located in the City of Whitby, Ontario.
Détails de l'emplacement
Adresse du site
1 Gerdau Court
Whitby,
ON
Canada
Carte de l'emplacement du site
L'épingle de localisation correspond à la zone approximative où a lieu l’activité environnementale.
Afficher cet emplacement sur une carte opens link in a new windowPromoteur(s)
Gerdau Ameristeel Corporation
1 Gerdau Court
Whitby,
ON
L1N 5T1
Canada
Détails de la proposition
This proposal is for an amendment to& Environmental Compliance Approval (air & noise) No. 9230-8Q8K5P with Limited Operational Flexibility for Gerdau Ameristeel Corporation, an electric arc furnace steel mill and metal recycling facility located in the City of Whitby, Ontario.
The emission sources from the manufacturing and associated processes that exhaust to the air include:
- an electric arc furnace
- ladle metallurgy
- continuous casting
- a melt shop
- a bar mill
- a structural mill
- a pumphouse
- cooling towers
- furnaces
- shredders
- recycling torching
- dust collectors
- slag handling and staging
- a carbon storage silo
- other equipment and ancillary and support processes and activities
This proposal is to renew the Limited Operational Flexibility and to reflect updates to the equipment at the facility. Emissions to the air from this facility include:
- particulate matter
- sulphur dioxide
- cadmium
- hexavalent chromium
- lead
- manganese oxide
- nickel
- products of combustion such as nitrogen oxides
The Environmental Compliance Approval with Limited Operational Flexibility (air), when issued, permits modifications to the facility subject to limits on operational flexibility that include a production limit for the facility to be specified on the Environmental Compliance Approval with Limited Operational Flexibility (air).
The limited operational flexibility conditions have an expiry date. The company will be required to make an application for amendment at that time to renew these conditions.
Documents justificatifs
Consulter les documents en personne
Certains documents justificatifs peuvent ne pas être accessibles en ligne. Si tel est le cas, vous pouvez demander à consulter les documents en personne.
Veuillez communiquer avec le bureau mentionné ci-dessous pour savoir si les documents sont accessibles.
Communiquer avec nous
Contact
Client Services and Permissions Branch
135 St Clair Ave West
1st Floor
Toronto,
ON
M4V 1P5
Canada
Commentaire
La consultation est maintenant terminée.
La période de consultation a eu lieu du 20 octobre 2021
au 4 décembre 2021